How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
Chromadek wide span mm. More or less Square new roof to replace existing. Roof need to be pitched at minimum 35 degress. Loft are above ground floor Existing roof (thatch to be removed
Replacement of soap dish and removal of DSTV dish.
In need of 1-2 wooden swing doors with locks to be installed and some extra wood work perhaps.
It is a standard double door garage.
The pins that hold the door in place fell off and the door cannot open or close. It cannot run in the track.
No hot water
We have a leaking problem from the office roof