Townhouse is empty - Cupboards need to be cleaned inside and the kitchen cupboards on top as well.
There's water leaking under the shower,such that the wall is showing signs of peeling swollen paint.
Have my own plan, contact me on
need doors, contact me on . slindingdoor for inside 2bathrooms 1 kitchen 2 for garage
5mm vinyl flooring Colour - "Mocca" or equivalent Remove existing sisal carpet
I need quotations
we are in the process of getting the plans and would like quotes for the construction for later on.
we're having construction done and would need general cleaning afterwards
we want 8 bedroom house with a closed kitchen and a 2 dining rooms and lounge as an open plan. One kids bathroom and main bedroom to have full English suite. 1 Laundry room with 2 washing tubs. Main bedroom to have a balcony and the dining to have a balcony as well. 1 study room, and gym room. The house must have a patio. 2 garages and a open space balcony by the garage.
Remove 13m vibracrete wall and replace with brick and plaster wall about 2.3m high and 13m long. Will decide on design and lighting upon quotation of generic wall plastered.