Change 18 downlighters to LED Change 9 double flourescents to LED Change and rewire alarm beams. They are own and are not linked to a alarm company Lay conduit and rewire or install blue tooth or any other device to open and close front gates. Must have intercom. Take out old wiring for DSTV. All LEDs have already been purchased
Building three homes on a stand in Mosselbay. A. Container 1x 12m2: 1. 1 x bedroom on left with en-suite: bath and toilet 2. 1 x bedroom on right with ensuite: shower and toilet 3. Entrance open plan kitchen/lounge B. Container 2 (the 12m2) to be the same as container 1 except both rooms to have a shower instead of bath. C. Container 3 (the 6m2) 1 bedroom with small shower in en-suite Services: Water, electricity, sewage connections, prepare stand that is currently on a slope Finishings: -black aluminum windows -sliding door for front -stable type back door -All finishings to be in white -Two x 12m containers to be placed in L- shape and 6m2 container to be place on side of container 1 to form a U shape
I need an electrician to just reconnect my oven and stove top currently they are connected to the same circuit breaker in the DB board I just need an additional circuit breaker installed (part needed) for the stove top and for it to be connected. The wires are already there and in place. Please provide a quote for work and circuit breaker.
I am a registered electrical engineer in South Africa and installed my own solar panels, inverter and battery. I need an electrical compliance certificate for the solar installation and also my whole house for claiming for tax purposes. The house has 2 DB boards, one for main house and other for cottage.
I have 4 smart tuya circuit breakers/timers that I need installed. The first will be used to monitor power usage of the entire house, the second will replace a geyser timer. The third to replace a pool timer and the 4th is to be used as a timer for the pool light. They are all tuya smart breakers and are supplied. The pool light is currently V i would also like it to be switched to 12V (I do not have a transformer).
We are looking to renovate 2 bathrooms, and tile 3 bedroom floors The two bathrooms, would include: -Tile removal -moving a few pipes -adding a skin of bricks to make a ledge + support structure for a wall hung toilet pan -installation of large floor drains in an attempt at making it a full wet floor bathroom -tile, and bathroom accessories installation The 3 bedrooms, would include: - Carpet removal -Tile installation Attached: You will find -Plans which include the current bathroom and bedroom layout -Screenshots of the proposal/ inspiration boards we received from an interior designer for the bathrooms - 4 Exports from a 3D model, of Master Ensuite showing potential implementations for the Main Ensuite (dual sink, dual shower, dual glass for shower, wall hang pan, floating shelves and cabinetary, and possible niches)
Currently live in a one storey 6 room house - three bedrooms, 1 bathroom, kitchen and living room. There is one more bedroom with shower outside and separate toilet. I would like to build/extend to a double storey with one garage. Ground floor - bathroom, 1 bedroom, garage, laundry/storage room, open plan kitchen with living room and sitting room. First floor - 3 bedrooms, bathroom and small lounge space. Located in atteridgeville extensions.
We have a temporary construction gate at our development in Glen Marais. The Body Corporate has raised concerns about the temporary construction gate currently in place. I would appreciate your assistance in providing quotes for the following options: 1. Repair and Reinstate the Construction Gate: To ensure it is more secure and safe. 2. Build a Temporary Wall: This should include plastering and painting. 3. Clear View Double Gate: A potential alternative solution.
Good day. The approved plans are attached. The eartworks are done and the engineers currently busy with the structural design drawings. I have attached photographs of the (before and after earthworks)erf in Capri, Fish hoek. Could you please provide an estimate for the project (turnkey). The area of the built is approximately sqm. Kind regards, .
The bathroom and bedroom are attached to one another and the shower is against the wall in between the two. So now over time the water soaked through the wall and the old (plus minus 4-5 square metres) paint must be removed on the wall where it started flaking and dampseal must be added two layers on top after which I will be painting new paint over the dampseal. And if possible what the costs would be.