Services: Sliding driveway gate, Wooden doors, Security guards, CCTV cameras, Fences, uPVC windows, Metal gates, Roll up garage doors, Palisade gates, House contractor, Automatic garage doors, Roofing contractors, Interior painting, Roof painters, Roof repair, Turnstile gate, House renovation company, Garden fence, Sliding doors, Wooden windows, House extension, Steel carport, Aluminium carport, Wooden garage doors, Double glazed windows, Metal carport, Garage door installation, Aluminium doors, Home repair
Bathroom 6x9 top hung vertical -white was quoted R.00 - BETTER PRICE will be appreciated. Please forward banking details to effect EFT payment to your establishment as soon as possible. I was informed it will take a day to manufacture - please confirm when ready This is a confirmed order. I will install it. Thanks
11 garage doors 22 garage trims 8 carports (excl roof covering) 22 units External window coating 92 units prime and coat barge boards / replacement where necessary gutters - prime and coat or replace where necessary Prep, treat, prime and print of palisade and 2 motor gates Prep, treat, prime and paint of electricity box, plumbing fittings and roofing vents (23 units) Prep, treat, prime and paint balustrades (not all units) 23 units Prep, treat, prime and paint garden gates
It is more of a shade similar to a carport. It is for my back yard. plus-minus 6m long by 3,5m wide. I am basically looking at covering the space between the two washing poles. The length between the poles is 7.7m – so 8m. The width is between 3.5 to 4m. Basically a carport structure – see examples further below. Not too sure but the sheets must let light through for clothing on the line.
Entrance and Exit gates, poles, turnstile, magazine box, small electrical box, casing of post boxes, gutter round the guardhouse and few other poles, intercom box and pole with security camera on., guardhouse door Close hole (small)where aircon is attached, replaster and paint 3 panels of walls plus pillar that shows peeling. Sign of complex
Building a new house about square meters in Darling close to Yzerfontein. 4 bedrooms (2 bedrooms with ensuite each and 2 without), main bathroom with full bath, shower, toilet and double vanity, each bathrooms must have extractor fans, 1 visitor toilet, Schuller, kitchen with build in cupboards and the big island, lounge with fireplace, double garage, big backyard stoep with a braai for entertainment, and front stoep. Estimated project start
A semi-detached house with both sections needing the following: (1) replace damaged roof sheets attached to the other section; (2) repair, plaster and skeem damaged kitchen wall; (3) strip and replace damaged kitchen ceiling (4) plaster and paint wall on neighbour's side; (5) fit flashing and waterproof side wall (6) fix and secure leak on kitchen roof (7) replace kitchen ceiling (8) repair all damaged walls.
Good day I am looking for quotes for a contractor on a new building(house) in Dwarskersbos, West Coast. I am in the process to get building plans finalized and herewith attached a proposal for now. As mentioned I am looking for a quote to see what will the financial implication be and if excessive that I should rework the design. Currently the house is m2, Garage 40m2 and then two open stoeps 30m2. I attach herewith the floorplan as well as visualization of the house Many thanx
Specification Painting of: Internal walls Ceilings Basement walls and columns Road markings External steel Doors and Wallpaper replacement, as per the attached bill of quantities. The internal office area is currently in use; therefore, the successful contractor will need to plan to carry out work inside the office areas over weekends per section or wing and completing the work on the Sunday so that the wing in question is available for use from Monday morning. Outside work can be done during the week. The successful contractor must submit a detailed project plan taking the above requirements into consideration for approval Shareholding (All these requirements must met) 51% black ownership 30% black woman shareholding (or at least 30% of project value to be subcontracted to a company that has black woman shareholding that we can pay directly). 10% black disabled persons shareholding (or at least 10% of project value to be subcontracted to a company that has black disabled persons shareholding that we can pay directly). Note: For black disabled persons shareholding the following are required: Submit proof of disability (letter from a doctor) Share certificate reflecting the shares held by the disabled shareholder. Like our twitter account: FM
Hi, I just need a basic amount so I can do my budget. The building was a garage but was converted into a studio with a door and windows and I would like to make it a garage again. It can be a double door or two single doors with automation (I have a device that must be added so it can work with my home assistant). So the door and windows need to be removed and the garage door(s) must be installed. There is power available for automation.
we want 8 bedroom house with a closed kitchen and a 2 dining rooms and lounge as an open plan. One kids bathroom and main bedroom to have full English suite. 1 Laundry room with 2 washing tubs. Main bedroom to have a balcony and the dining to have a balcony as well. 1 study room, and gym room. The house must have a patio. 2 garages and a open space balcony by the garage.