How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
I need waterproofing around the foundation of my house, there's water coming out from the ground. The plaster is coming out from inside.
Painting of lounge and 3 bedrooms Plastering external wall Painting external walls whole house Replace bricks with glass bricks 2m x0,5m Building stoeps around the house to block water damage Erect veranda front and back of house Helps with water drainage systems
Suction point installation for Septic tank
Remodel of 6 sqm bathroom; shower, toilet, sink with vanity and mirror plus tiling.
install drainage as per layout with a gulley. Install 2xwc, 1xbasin, 1xshower, 1xbath, 1xsink, 1xgeizer, 2xgarden taps, 2 x washing machine points. Would like installation in 2 weeks time. Require PIRB Certificate.