Currently live in a one storey 6 room house - three bedrooms, 1 bathroom, kitchen and living room. There is one more bedroom with shower outside and separate toilet. I would like to build/extend to a double storey with one garage. Ground floor - bathroom, 1 bedroom, garage, laundry/storage room, open plan kitchen with living room and sitting room. First floor - 3 bedrooms, bathroom and small lounge space. Located in atteridgeville extensions.
We have a temporary construction gate at our development in Glen Marais. The Body Corporate has raised concerns about the temporary construction gate currently in place. I would appreciate your assistance in providing quotes for the following options: 1. Repair and Reinstate the Construction Gate: To ensure it is more secure and safe. 2. Build a Temporary Wall: This should include plastering and painting. 3. Clear View Double Gate: A potential alternative solution.
Years of borehole water has sludge build up and the pipe need to be replaced. The pumphouse is situated between portions 28 and 29. The pipe will need to follow the length of the road to the cul de sac and circle back on the opposite side. Two pipes to be laid. One in use now and the other to be used once the estate has potable water.
Good day. The approved plans are attached. The eartworks are done and the engineers currently busy with the structural design drawings. I have attached photographs of the (before and after earthworks)erf in Capri, Fish hoek. Could you please provide an estimate for the project (turnkey). The area of the built is approximately sqm. Kind regards, .
I’m looking for a company that can do the following -complete tiling, 80% of tiling has been done -Do Ceiling the whole house -plumbing -electricity - landscaping -electric gate installation -aluminum window -touch ups on exterior wall and house walls inside and outside -bathroom and shower -toilet to be completed -open floor plan kitchen and lounge area - built in kitchen cabinets
1. Improve/remodel shower, install shower panel. 2. Remove all gutters, repair fascia boards where needed and repaint. 3. Install new PVC gutters and downpipes. 3. Replace stoep fascia front with Nutec and paint. 4. Paint whole roof with rubberized paint. 5. Paint whole house outside. House size about m^2
3 en suite bedroom and an en suite main bedroom with walk-in closet. A guest bathroom with bathtub and shower. An open hallway leading to an open plan kitchen with utlra-morden finishes and a scullery. A formal lounge or dining area and a informal tv or family entertainment area. A patio and double garage with a carport.
Hello. I am looking to renovate my apartment. This will include as a minimum: 1. Full refit of guest bathroom (swap bath with shower, complete re-tile and re-fit) 2. Partial Refit of master bathroom (complete re-tile, upgrade fixtures and fittings) 3. Grout, sink aircon ducting, waterproofing and re-tile large balcony 4. Construct concrete chair structure to balcony 5. Fix master bathroom sliding door that has come off tracks
I want to build a 3 bedroom house,with open kitchen and dinning room plus patio.