I have the plans but they still need to be submitted to council. I have recently bought a plot in De Rust, where I would like to build a 3 bedroom 2 bathroom home. Around sqm. I am going to be completely off grid and want someone that can integrate solar electricity and water collection systems into the build. I want a very simple and elegant build, open plan. I have a strict budget to stick to and will be building through means of a building loan through the bank. I am ideally looking for a turn key solution and want to avoid having to sub contract too much of the work. Thank you in advance for your quote.
The current house inside walls must be removed to create one big open plan. The roof re structured. The current garage and outbuildings must be converted into a one bedroom flatlet with small kitchen. A workshop will be added to this at the back. New addition with a TV room and three ensuite bedrooms will be build onto the current house. Attached find current house plans as well as a plan for the new project. The specifications are as follows: Cemcrete or relevant floor, no floor tiles. Structure build with light clay stocks to be washed and sealed with limited plaster and paint work. Open roof trusses painted white. No solar or electrical geyser only Gas geysers for all bathrooms and kitchen. Gas stove for main house kitchen. No stove for flatlet. Covered patio. Windows to specifications. Lights and fittings to specifications. No baths for the 4 bathrooms only showers.
I have a 2 bedroom house in a Home Owners Association complex in Douglasdale. There is a small pool. The garden has an irrigation system that needs repair. Grass needs mowing and Flower beds needs work. PLEASE PROVIDE A QUOTE FOR REGULAR VISITS INITIALLY ON A FORTNIGHTLY BASIS. Thank you.
The front of the house is a double storey, the back is only one storey. I need another floor added to the single storey, with a double garage, bedroom, bathroom and entertainment room. As well as a kitchen and dining room at the bottom of the existing floor. The bottom floor would be around 11 x 9sqm and the top floor would be 6 x 9sqm.
I have an eviction issue, I need the guards to be at the house until the house is sold. Please also let me know if the guards are able to stay over in the home for this time. The occupants are occupying the house without pay and will be removed, I will need the guards to be there as well. This will likely be a high tension situation and I need know if you would be able to help with this.
e) Specifications for Verandas (i) ±1.80m wide x 12.00m long (ii) 0.47mm Colorbond amor gray corrugated roof sheeting of single length, to minimum slope of 5 degrees, fixed to 50 x 76mm SA pine purlins max. 1.20m spacing, fixed with hurricane clips on both sides to 50 x mm SA pine rafters max 1.20mm spacing, fixed to 50 x mm bearer beam, that is fixed to container with 10mm stainless steel bolts, on 50 x mm bearer beam fixed with stainless steel bots on top of a mm diameter galvanized steel posts with purpose made bracket, spaced at least 3m apart, cast into minimum x x mm, 15 MPa concrete bases. (iii) All exposed timber surfaces to be painted with one coat wood primer and two coats white enamel paint
I am looking for an accounting service that will be able to provide me with continuous advice on how to best structure my tax liability to be cost effective, provide advice on whether deductions will be allowed/not allowed prior to filing a return to ensure that the return is settled with as little additional to and fro as possible without costing me in interest. I also need the consultant to take charge of when I need to submit what (as a provisional tax payer) and keep in constant communication with me on progress. I do not want someone that just take my money and leaves me to follow up with either them or SARS on what is happening. I want to feel that I am able to ask questions and discuss possible solutions without the clock ticking at a Rand a minute. A set fee would be preferred so that I can budget accordingly.
1. What is the basic voltage and frequency use in a) A house B) Office Block C) for farming? 2. Is the above single or 3 Fase module? 3. What is the motor capacity HPR? Kilowatt 4. Do you need a direct variable drive motor eliminating batteries to work only with sunlight? 5. Office needs batteries optional online and offline Eskom and Solar
Hi, we need an alarm installation system with armed response and perhaps with cctv camera monitoring system. If you have electrical fencing services I'll be glad to see the prices for your packages as well. We need this as in yesterday because thieves have been bothering us lately by targeting our backyard garage. Thank you.
Full renovation including kitchen remodel, small guest loo remodel, vinyl flooring for about sqm, paint all walls, stacker doors at entrance, new light fixtures, relining pool, enclosing an 8sqm courtyard to form part of the kitchen as a scullery, removal of pillars in the living area which take up unnecessary space (engineer has said its possible with box support beam).