How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
I need a estimate to build a 1 bedroom open plan lounge and kitchen 7 x 8 granny flat
I need two concrete floors of 80m2 each (m2) x 80mm to be laid. The floor needs to be floated smooth
I want to add a garage and an unsuited bedroom on too of it (loft style with stairs), at the same time extending the kitchen below it. Also remove the wall between living room and current bedroom.
Bathroom 1: change all pipes and tiles, remove bath and change to shower. New basin Bathroom 2: change shower, toilet and bath and basin new tiles
Looking for someone who does subsoil.
Extention on existing roof
4 bedroom home, 2 en-suite, lounge, dining room, open plan kitchen, double garage, 1.5 guest bathroom in a village