Cost guides
Paving
Paving blocks

How much do paving blocks cost?

  • R150R300 / m2
    Paving blocks
Get quotes

Having difficulties deciding on which paving blocks company to choose?

We've examined the current prices and compiled a list of the most useful prices and fees associated with paving blocks to help you get one step closer to your decision.


Paving blocks

  • R150R300 / m2

The price is for paving blocks only. It is dependent on variety of the block (brick color and style, thickness of the bricks, its strenght, etc) and transport cost. The cost of paving blocks typically runs from R150 / m2 to R300 / m2, averaging at R200 / m2.

Get quotes

Paving (materials + labour)

  • R300R580 / m2

Listed price includes paving bricks along with paving labour and all the additional costs such as transport, extra materials needed for paving etc). The final price depends mostly on the size, model and quality of paving materials. On average, expect to be charged between R300 / m2 and R580 / m2 for paving (materials + labour).

Get quotes

Recent jobs for paving blocks

Paving

  • City (or suburb) where you need the service: Germiston
  • Surface: 30 - 99 sqm
  • Do you need paving materials as well?: No, I have my own paving materials.
  • When do you need this service?: As soon as possible

We want and inspection to be done for professional eye to have a look and quote but according to the basic knowledge we have see below scope. Using precast kerbs with cement stabilised fill material. Construct a 2m x 2m level platform for Jo-Jo tank 2) Break-out existing ½ round precast channels and concrete and all existing concrete and piled debris in area between building and precast wall and remove to spoil. 3) Do earthworks to form gulley to control stormwater from adjacent property and yard up to palisade fence midway down building 30m² . 4) Install 9 x precast barrier kerbs alongside existing precast wall to cover foundations and exposed base of wall 9m. 5) Supply and lay 60mm interlock blocks to prepared gulley 30m². 6) Do earthworks to form gulley to control stormwater from top to bottom 30m². 8) Supply and lay 60mm interlock blocks to