High-security type. I would like to have an indication of the total price and the specifications that the price is based on. Pricing must make provision for two double entrance gates (for passing of trucks/tractors) and two pedestrian gates. Please note will not be taken as a final quote as it is only for me to see how much funding I should request. A final quote will only be accepted after a site visit. Please advise if there is anything that I might not know of and have to consider in my specifications.
Kindly quote us on the following X2 please: 1. Fence(diamond galvanised) 2.1mh with sliding gate 2.1mh X1.1m Wide – use /50 X2mm bottom rail with mm wheelset 50/50 X 2mm square tube frame 40/3mm angle iron guide rail and mesh Bolt on track 40/5mm flatbar with 10mm round bar and fixing lugs Posts 3m X 76/76 X 2mm on baseplate / X 8mm Frame and posts(in galvanised) Transport & labour 1. Fence(diamond galvanised) 2.4mh with sliding gate 2.4mh X1.1m Wide – use /50 X2mm bottom rail with mm wheelset 50/50 X 2mm square tube frame 40/3mm angle iron guide rail and mesh Bolt on track 40/5mm flatbar with 10mm round bar and fixing lugs Posts 3m X 76/76 X 2mm on baseplate / X 8mm Frame and posts(in galvanised) Transport & labour
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.
We require someone to do electrical cable runs under the ground around a property (property size Dual Ducting along route for our fibre line. We will need 3 outdoor plug points in a outdoor enclosure (enclosures to be provided by you) V at all 3 points, including the guards room. We are also looking for someone to lay Fibre with 18 Fibre splicing at each camera post.
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Fault-finding, Repairs and installations: 1. 2 inside lights (fault finding and repair) 2. Installation of a 60A circuit breaker on the main DB 3. Installation of an 8 way sub DB 4. Running a m surfix cable disconnecting the existing cable from the current nodal point (Underground including wire ways -pvc conduit) 5. Replacing 1 single pole - 2 lever switch. 6. Rewiring of 1 single pole switch - 2 lever switch. 7 . 2 outside floods lights (fault finding and repair) 8. Installation (light circuit and socket outlet) at the guard house. 9. Installing 10 photo cells on the existing circuitry
Attached are screenshots of the type of fence and the dimensions of the property taken from google maps. The Gates will be 2, one sliding and one swing gate. The detail of that ill discuss as soon as I get the dimensions for it. Please do communicate via email as I am out of the country. Thanks
We had our house renovated and the guys assigned to do our electrical work completed in August, they tried to install a light but opened the DB to draw a wire and problems started..Our earth leakage trips randomly..they tried to fix it but failed, now they had to bypass the earth leakage and even changed the prepaid meter so that we can temporarily have electricity. The previous prepaid meter was showing an overload even when eskom was off. The new meter constantly beeps and signs bypass. We have seen 2 electricians thus far.
Installing electricity from scratch in a 4 roomed house with a toilet/bathroom/shower (fifth room). 1. Removal of DB from outside of the house 2. The DB will be in a garage. 3. The lounge will have 2 plug points (double) and 1 double switch. 4. The kitchen will have 3 plug points (double) and 1 double switch. 5. The main bedroom will have 2 plug points (double) and 1 single switch. 6. The second bedroom will have 1 plug (double) point and 1 single switch.
Good day, I am looking for a quote to fit an outside waterproof plug to my new JoJo tank. The tank is standing outside and is close to a bedroom where we could get access to a wall socket for a connection to the water pump. Length is approx 15 meters of cable.... the tank will stand in the corner as in the photo... there is a bedroom behind the brick wall where we can access a wall socket