Room 1 new double point plug point with box and calvinized pype 2 existing plug point with new box and double point plug 2 blank box and cover for unused underfloor heating point 2 existing light box and dimmable toggle switch 1 new light switch with box and dimmable toggle switch 3 light fittings installed Living area 10 new double point plug point with box and calvinized pipe 6 existing plug point with new box and double point plug 1 oven point with new box and isolator 2 new light switch with box and dimmable toggle switch 8 new light switch circuits 6 dimmable globes cool white for spots lights 6 new light switch with box and dimmable toggle switch in calvinised pipe and fittings installed 2 move and adjust light fittings Stairs 2 existing light box and dimmable toggle switch 1 light fittings installed Sub DB 1 split of circuits fo non essential and essential
We have a spec sheet of the products required - We require 5 x light posts to be cemented in, primed and painted. n 5 x solar lights to be fitted to the poles. 1 x solar light to be bolted to a wall and two more lights to be attached to a bell tower (traffic circle) with extension / fastening poles
Good day, i just to find out if you do automative Garage doors with the current door or do you recommend putting in a new door with the automatic system. The size is 4.84 (width) x 2.80 (height). Please let me know. We are desperately looking for an automatic door, because this door we have to push up and pull down and the door is very heavy. Hope to hear from you soon. Kind Regards
Please message me on Whatsapp. I will be able to respond there during work hours. Old doors that flip up and when up are half-in, half-out. Currently wooden, want to replace with something better quality and automated. Also a “garage door” that is behind the gate, blocking a view of the driveway - same mechanism and door type as the garage door. I want that driveway gate and both garage door gates replaced and automated.
Please email me, I will then respond from there. "SCE" portable electrical oil finned heater defective (not switching on). LED on on-off switches also not illuminating. Thermostat makes clicking sound when turning lever. Already tested on alternative power supply without successes. Require quote to repair.
Our HWC switch on the main electric panel has been tripping for the passed week, I thought I repaired it by resetting the main and earth switches but the problem persisted days later. I noticed that the resistance of the HWC (geyser) switch is weak, which I think is the cause of it immediately falling down once pushed up.
Please email me. I am in meetings most of the day and unable to take calls. I need 2 stable doors replaced, I have the doors, locks, handles, and new brass hinges. I need my living room ceiling repainted approx 8 x 6 meter. I have a small step or plinth outside my kitchen door that needs to be tiled. Existing tiles removed and new tiles laid. I have the tiles. They are x Moroccan tiles. Please can you provide an hourly rate or day rate and advise how long it will take en when you can fit us in.
Five room with double garage and bathroom kitchen with three separate double plugs and one single plug and sitting room with two separate double plug, the other three rooms each with two separate double plugs, eight outside lights operating with day/night sensor one plug in garage and two bathroom and isolator for stove. Each room with single switch and two passage switch and light in veranda.
4 bedrooms 1 bathroom in the main 1 bathroom for the rest of the bedroom s Sitting room Dining room Kitchen Double garage 10x outside led spotlights 2x outside normal lights 1x socket outlet for geyser Please include 2 quotes 1 with downligts, chandeliers and special lights in the bedroom and family rooms 1 with normal lights and normal plugs Please also include labour cost and call out charges so I can know how much I must budget for. Thank you
Urgent: A complex in La Lucia require 7 floodlights to be installed into already existing points (replacing of old floodlights) As part of a Body Corp, We also require the necessary documentation: 1. CIPC registration 2. Letter of good standing - Dept of Labour 3. Confirmation of Banking Details 4. Liability insurance