Hi i would like the following done: a. the outside area around the house to be water and damp proved b. the outside area to be tarred and clear fenced c. the driveway from the house to the entrance of the road to be tarred d. the entire house to be sealed and damp protected e. the entire house to be painted f. the bathroom requires: two taps in the bath, the existing sink to be replaced, a full shower fitting with a rod for a shower curtain and a toilet roll holder. e. the geyser to be installed but need to be discussed before purchase f. 2 bedrooms requires built in cupboards e. kitchen needs built in cupboards with sink and taps requires replacing the roof also requires damp proving
I want to build flets 2
I need to renovate house first
We would like to re-do the whole bathroom. Remove the bath and install a shower. replace the tiles on the wall and floor. Replace the toilet and basin and add a floating shelves under the basin. we would also like to re place the ceiling and lights. I want a rain shower as well as a adjustable hand shower. we currently have a shower in the bath but may need to move the pipes to accommodate the new design. We would also like to place the toilet in a different location in the bathroom to make it more spacious. We have an idea of the layout but we are open to suggestions. We would like to start mid March, but would like to work out the budget before then. our bathroom size: cm length by cm width.
I want a three room story house with a garage on the ground
Afternoon , I do have a project which is supposed to start any time soon its a ground floor with a story on top of the double garage part and the lounge dinning and kitchen part. So it will be having 3 bedrooms on the ground floor 2 will be having ensuites ,a study room, separate bathroom and toilet and also an outside toilet On the first floor is, main bedroom with ensuites and separate toilet , lounge and the veranda part with palisades. In short...