I have purchased a 5.5 kW ECCO hybrid inverter and 5.09 kWh SVOLT LeFePO4 battery combo. I need a certified electrician to install this and provide a CoC. The inverter must be wired to supply lights and plugs (not geyser and oven), with no changes to the existing DB. Can you help? I would ideally like installation to take place in the week of 23-29 October .
I'm in cape town airport industry 2 am Malawian i do electric plumbing painting tilling and welding waterproofing etc.
Three bedrooms kitchen dining sitting area double garage two bathrooms and three outside lights
Installation of oven bake element
Replace light fittings (interior, front door and outside gate)
We want to take pictures at the beach with our wedding attires.
There is a switch that trips if the gate is on
Simple
Please message me on Whatsapp.