Remodel of reception area
remove pipes
Painting and spalling check. 8 unit 4 storey complex To start Feb . Chakas Heights 45 Ocean Drive.
Level floor then do laminating there two bathrooms that needs remodeling. Want to also remove all of the tiling from the bathroom. Not sure if we want to tile/laminate the passage way.
Toilet is not refilling water to flush after use
I want a litre geyser that uses both solar and electricity.
Roof K/Side 98m squared Roof K/Side m squared Eavs K/Side 25,2 m squared Eavs F/side Running/m Eavs Elevation side Eavs Driveway side 23m squared Driveway Elevation 26m squared Back Elevation 14m squared Front Elevation 14m squared Kitchen Side Elevation 14m squared B/walls 9m squared B/Walls 9m squared B/Walls 9m squared
Kitchen twin sinks plumbing disconnected and leaking seals. See photos
Standard roof tiles clean and 2 coated painy