Plans were submitted and approved. An engineer has been appointed. Want to remodel (break down 2 walls and refurbish existing bathroom) sub economic house and add an upper level consisting of a bathroom, 2 bedrooms and a pyjama lounge. The plan is to use nutec/timber on the upper level and a conservatory on the ground floor level. Please see attached plan.
Medical facility with dry walking to be done. Also electrical points etc with reception area and nurses station. I need companies on site tomorrow in Randfontein for quotations. Contact Number: +27 67
I need to destruct current garage and build double garage with separate room and toilet
3 bed home partial double storey & double garage
House extension
Extension and renovation entrance hall, lounge, dining and sunroom
Need a 9x6 garage with three windows, two garage doors Door x 1 built on back wall for future patio door
Build out the deck on the second floor and redo the kitchen
I am looking for a rough qoute on building a new house, that has 4 bedrooms, 4 bathrooms and a study.