5kva with 6 solar panels with inverter and lithium ion batteries
I am not currently ready for a site visit, would just like an approximate quote for now based on the following information: I would like a quote for consideration on an 8kW Hybrid Inverter System with 10kWh of Battery and 8 by Wp Solar Panels. Roof is tile with a pitch if 15 Deg facing north, cable run 12m. Inverter in garage which is 6 meter from main DB
Existing W 24V pure sine inverter. 2 x W panels. 4x 12 V lead acid batteries. 24v 60A alternator on 10hp diesel motor supplies about W. I need 2 more W panels. Also 2x 3.5kW lithium 24V batteries. Existing 2 panels to be relocated for max perfomance. Sub DB from inverter handles 5 kW per day. I am hoping to sell the propert soon , therefore would not go to big. Would rather go fullhouse on my property in Port Elizabeth.
There is 5.5w battery and inveter 5.5w in place as backup.
I have a solar,inverter and a betery i need someone to program it for me
Whatsapp or email - preferably Whatsapp communication please. To replace faulty and leaking stop cock. This is the main water supply pipe to our unit in a complex. Water supply to complex must be turned off , so that the stop cock can be replaced. I've done renovations to our flat ,and discovered a ancient, faulty stop cock. The stop cock is leaking and is on the main water supply pipe to our unit. We need to replace this faulty stop cock, and fit a new one. The problem is that we need to turn off the water supply to the complex, replace the stop cock, and return the water supply.
intended for use at school of 8 blocks (admin block included), for lights, four printing machines, two photocopy machines, kettle, heaters in classes during winter (can be 8), four refrigerators, five aircons, one geyser. Our school has learners with 40 educators situated at Ext 71 Madiba park in Polokwane.
How much would these services cost : - Scraping down, prepping and damp proofing (per square metre) - Paint whole building - 2 coats - Repaint logo of the business - providing own accessibility to higher parts of the building ( such as ladders, scaffolding, etc) - Prime entire area and reseal with Alcoflex or equivalent - I have attached an image specifying other things that I want to be done ( leave out services that you do not do ). - The building is approximately 80sqm total size
3 bedroom house Inside and outside Gate front wall inside and outside Durawall
Toilet is not flushing properly. It only flushes when I open the clean out pipe and let the air out. The last few days even that is not helping to make it flush and the drain fills up. Solids take forever to flush down. Water level in toilet drops and it makes a glugging sound that goes on until I open the clean out pipe.