Repair/replace a litre solar geyser. This litre solar geyser is using geyser wise and currently does not heat the water. The diagnosis given by technician is that the system was damaged by loadshedding. I'm looking at the possibility of converting this geyser to a "solar power only" geyser.
Good day, I need an urgent quote on the repair of a gate and electrical fence. We had an accident on Friday where someone hit the gate with a vehicle. Please find photos attached: The gate is off its socket and has a dint in, The access area is also broken so needs welding, One of the wires of the electrical fence is also ripped out and the gate cannot currently open with the remote. We also cannot put the fencing on. The physical address is: 23b Impala Street, Onverwaght, Lepalale I need someone to assess and quote at the address today after 14:00. Thanks,
Greetings, require a 5kwh hybrid solar inverter with 5.09kwh lithium battery - mid range- 6 solar panels w each with rails etc, solar cables 10 meters, include required components (MPPT charge controller to be bulit into inverter, switches and surge arrestors and fuses with combiner box ) all other components and about 10 meters of power cabling from main DB Box. Installation on flat torched on - roof - rails secured on wooden beans.
1. What is the basic voltage and frequency use in a) A house B) Office Block C) for farming? 2. Is the above single or 3 Fase module? 3. What is the motor capacity HPR? Kilowatt 4. Do you need a direct variable drive motor eliminating batteries to work only with sunlight? 5. Office needs batteries optional online and offline Eskom and Solar
Good day Hope you are well.. I have a project of about 10 rental units that are going to need basic electrical installation for all rooms and building . I would like to receive a quotation according to the building plan as it is. i will attached the building plan layout for a more specific quote. Thank you
I will like to know, I have a 2-bedroom property in Midrand and I currently am using about R a day on electricity tokens, which I was told is a lot, below is the items that is in the house. My meter box is a Hexinga. I bought the house and that’s the box that was there. I have a gas stove so no power from there is being used, the geyser is on, the TV’s are on but not through out the day and lights, fridge is on, but that’s about it and we 3 in the property and still the usage is high. Is it possible to do a check and what will be the charge
High-security type. I would like to have an indication of the total price and the specifications that the price is based on. Pricing must make provision for two double entrance gates (for passing of trucks/tractors) and two pedestrian gates. Please note will not be taken as a final quote as it is only for me to see how much funding I should request. A final quote will only be accepted after a site visit. Please advise if there is anything that I might not know of and have to consider in my specifications.
We are a school called Phendukani Full Service High School in the Madadeni Township. We are looking for solar panels to cover us during load shedding. This can occur for 3-4 hours, generally only once during the school day. A previous quote recommended that we'd need an 8.8kw inverter, a 5.1kw lithium battery, and 12 w solar panels. So we are looking for quotes for systems similar to this. We are happy either to rent for 2-3 years or to buy, and would like quotes for both. Thank you for your time, we look forward to your response.
Kindly quote us on the following X2 please: 1. Fence(diamond galvanised) 2.1mh with sliding gate 2.1mh X1.1m Wide – use /50 X2mm bottom rail with mm wheelset 50/50 X 2mm square tube frame 40/3mm angle iron guide rail and mesh Bolt on track 40/5mm flatbar with 10mm round bar and fixing lugs Posts 3m X 76/76 X 2mm on baseplate / X 8mm Frame and posts(in galvanised) Transport & labour 1. Fence(diamond galvanised) 2.4mh with sliding gate 2.4mh X1.1m Wide – use /50 X2mm bottom rail with mm wheelset 50/50 X 2mm square tube frame 40/3mm angle iron guide rail and mesh Bolt on track 40/5mm flatbar with 10mm round bar and fixing lugs Posts 3m X 76/76 X 2mm on baseplate / X 8mm Frame and posts(in galvanised) Transport & labour
I have 2 wall sharing outbuildings. I would like 1 of the unit to have plumbing and electric completed. The plumbing pipes are already in place, just need connection in bathroom. Electricity needs to be pulled from main house to outbuildings. Then interior will need cementing in bathroom and main room(bachelor unit no walls besides bathroom). Roofing is in place, it's corrugated. Will need ceiling.