I use wiring cables1. 5mm and 2.5mm.under 1.5mm i use Red as live black as neutral and blue as a returner. In 2.5 i used red as live black as neutral and green and yello as an earth
WE NEED SOMEONE TO CONNECT THE WIRING OF A NEW STOVE
I experience excessive use of elec units need to address this. Best way to establish where what is using electricity? Need to change 3 phase connection, current statud, back to 2 phase, process required? How to optimize my solar installation Tx
We have an old fuse box with one or two trip switches for mains and geyser. Just want a quote to have this replaced with a more up to date box and a wifi geyser trip switch controller. This box looks like single phase and build possibly in the s. Please email for more information. Thanks
Require Electrical Certificate of Compliance
Please provide me with a quote for the following: APPLIANCE REPAIRS – 7TH FLOOR GAS STOVES 1. Major services of gas stoves 2 2. Replace switch nob 1 RETIGO OVENS 3. Replace flexible pipe 1 4. Replace water solonade (steamer valve) 1 DEEP FRYERS 5. Replace thermos switch 1 6. Major Service 4 7. Replace cut off switch 1 DISHWASHER 8. Major Servicing 1 9. Re-programming rinsing settings 1
Have license need certificate
I have 19 florescent light to be changed.