Waterproofing walls, floors & roof (rubber) . 2 bathrooms remodel and moving of door in another bathroom to make it ensuite. Interior & exterior Painting, kitchen remodel & extension. Lounge extension. Change exit & garage doors. Replace window frames with black steel frames. Build wall fence ~ zinc pool with deck. Bamboo cupboards installations in all 3 bedrooms. Flooring will be installed by my company of choice. Already arranged. Replacement of gutters with tank for rain water, pool privacy fence
Replacement of 4 steel door frames as well as the doors and locks. Waterproofing of shower walls as well as floor and tiling of shower walls and floor. Re-tiling of bathroom floor. Must be a registered NHBRC builder and must have a defective workmanship insurance. Must replace tiles around new door frames where necessary and must clean up afterwards to a state how it was before.
In need of renovation of a four bedroom house with two bathrooms, living room, kitchen and a single garage. The following is required for the house: Ceiling Window frame replacement Doors and door frame replacement Re-wiring and lighting Roof waterproofing Tiling Bathroom installation Bedroom wall units installation Kitchen plumbing Kitchen unit installation Pavement installation Wall fence and gate installation Tv stand installation
Good day, We require a contractor to assist with the costing as well as the renovation of a property located in Westville Durban. This is a renovation of a property and not a new build. Architectural drawings are in place (not structural) and submissions will still be made to the local authority. The client requires an estimated cost of renovation by the 04 April .
We have 2 buildings on one property. One 2 bedroom house and a entertainment area. Plans are currently in circulation with the counsel for approval. We will need to build in stages starting with the foundation of the main house first. We are looking for estimate quotations to see what we are looking at per stage for us to plan and the full cost as well.
Have multiple projects need scoped: 1: New ballustrade on stairs to match existing. 2: Flat roof resealing 3: House exterior wall patching, resealing, paintinf 4: Braii area drywall ceiling repair 5: New screed for interior concrete floor 6: Possible wood/bamboo floor installation 7: ladder construction for bedroom lofts to match stairs style
I need a building on a caravan site. The cement floor is 6.2m x 8.27m There is an existing bathroom and kitchen on the site and the new house must be build as close to the existing building as possible. There is currently 3 caravans on the site and they are rusted and needs to be removed. A very small 3 bedroom and living room must be build on the site. I did draw up a plan in but the person who drew up the plans didn't want to submit it for approval. I attached the plan but it is not approved by the municipality. The building must be face brick inside and outside. Please give me a quotation. Please give me a quote.
Our company, SA , is looking to open an office in Rustenburg at vanna Mall, and we are looking for the following companies to assist with the following: • Electrical • Painting • Flooring • Dry Wall • Build Kitchen Unit • fety equipment Please submit the following documents as soon as possible if you would like to be included in the list of businesses that can help. • Company Profile • Up-to-date BEE Certification • Banking Details (Letter from the Bank) • CK Documents • Tax Clearance Certification • Letter of Good Standing (LOGS) • Public Liability Insurance • 2 X reference letters not older than 12 months • COC NB: Please make sure that all documents are sent at once rather than in separate parts. Your urgent response is highly appreciated. Kind regards
I hope this email finds you well. I am in the process of planning a home extension and am currently gathering quotes from various contractors. I would appreciate it if you could provide a quote for the required work, with the intention of starting the project as soon as our plans are approved. At this stage, we are awaiting approval and anticipate that construction could begin toward the end of August or early September. Of course, the start date will depend on the approval process and weather conditions, as this time frame coincides with winter. Could you please provide a quote or share any details about your availability? I am eager to move forward with the project once the plans are finalized. Thank you for your time and consideration. I look forward to hearing from you soon.