Claim it for free and start getting requests from customers in your area.
Claim profile for freeInstallation of 3kv hybrid solar inverter to battery and grid.. Please give me quotation if you connect it with a single solar panel as well.
Renovation
It is a double story renovation from rental to a bed and breakfast. There is four to 5 plugs per room, every room has an en-suite bath/shower. It is 11 bedrooms, kitchen, dining area, Reception area, 2x linen rooms, each floor has its own DB, earthing required, outside lights working with a day/night switch, 2x geysers, 1 stove
A double story with Atlassian 2 garages
Connect inverter to main DB board and provide COC
Old building and I am wanting to redo the bathrooms, x2 and tiles in the lapa (10 x 10 m) and carports (3 cars and boat and caravan)
Open plan with 3 bedrooms
There is a huge crack on the wall, top to bottom. Repair work to wall needed. We live on a Farm and was advised that the wall needs to be braced. I need the Pro's advise on whether plans are needed or what options we have.
The original owner had a two room, garage & kitchen at the back of the yard, she wanted to live here and build a house in the front. I now own this property and want to carry out this idea and build a possible two storey house in the front.
DB keeps tripping every time the outside censor light goes on. Please could we have that looked at and repaired?