Electric Fence main components (materials) Corner poles 3m height Corner stays Y standard free standing 3m Wires per length, spacing and lines. Electric bare wire spacing: mm x 20 lines HT cables per roll Earth spikes placed every 15m of fence, Connected to the poles. Energizer per zone Siren 30w Comms cable per roll Keypad Enclosure fibre glass Warning signs place every 10m of fence line and gates. Lightning diverters per zone Concrete casted over the whole length +/- mm (mm in the ground & mm above ground) 1.2 Accessories Bolt & nuts, insulators, clips, hooks, ferrules, tensioners, strainers, contacts & brackets, etc 1.3 Existing Palisade Fence Existing fence to be left as is and be inside of the new Electric fence +/- mm apart. N/A N/A 1.4 GATES Double entrance gate to be fitted with electric fence. Gates shall be connected to the overall electric fence. Standard locking device adaptable to the Municipal lock.
I have block of flat Project requiring new Single phase installation. Take one apartment would have: ●6× Lighting points ●2× Double socket outlets ●7× Single socket outlets ● 1× × Single phase DB ●1× Stove circuit ●3× Bulkhead outdoor light in day/night switch Installation type: flush mount installation
Good day, kindly provide us with a quotation for materials and fitting labour separately, as per the farm layout, dimension and fence type proposal in the accompanying table. where possible kindly quote us using wooden poles kindly make out the qoute to ' farm', winterton, KZN; att: Gerald The gate must be motorised and solar tower friendly Together with the pedestrian gate .
It is a 1 and a half bedroom flat. I would like an evaluation done on the wiring in the kitchen specifically. A certain plug trips the Earth Leakage constantly and I'm concerned that the wiring might not be safe anymore. Also the ceiling light in the kitchen has stopped working. Replacing the bulb with a new one did not fix the issue.
Looking for a certified electrical contractor for a new construction project. From initial City Power application to final sign off. (Labour only) Project is 18 Units. 9ground floor units and 9 first floor units in one block. 2 bedrooms/Unit. Units about 42 sqm Rough estimate per unit is as follows * 10 plug points * 7 light sockets * 5 light switches * 1 DB board * 1 Stove switch Perimeter lighting points and access gate electrification
want to know how much a new db will cost me with 2 x20amp circuit breaker and 1x10 amp circuit breakers ,40 A man circuitbreaker and one earth leakage ,to new led lights in bathroom amd bedroom . and one lightswitch for bathroom with its extetion box as it is old steel ones ,,how mich will it cost to supply and rewire db again .its only this beacuse its a outside builder at the back of my house
Garage installation 1. Small DB(E/L plus two c/b 20A and 10A) 2. 20mm pvc conduit (3) 3. 20mm 90 degree bends (5) 4. 20mm hospital saddles (10) 5. 20mm male adaptors (6) 6. 20mm couplers (3) 7. 20mm 3way junction box (3) 8. 1.5 led double fitting (1) 9. 4X4 surface mount box (2) 10. 4X4 single plug (2) 11. 4X2 surface mount box (2) 12. 4X2 two-way switch (1) 13. 4X2 double switch, one-way and two-way (1) 14. 20watt led flood light (2) Please quote me on the above-mentioned items supply plus installation Please call me for more info.
My geyser switch keeps tripping on the DB board. We live in a complex so I contacted the body corporate that sent an electrician and said the thermostat was faulty. The electrician replaced the thermostat but the problem still persists. Not sure what else the issue could be. Please advise how much it would cost to repair?
I have a 2 Bedroom Townhouse in Gonubie it has18 plug points. There is a -litre Geyser, 4 plate stove/oven. Would like to have this done in stages, plug points first, then Geyser, lastly Stove. I need a professional that knows how to install a solar panel that will accommodate all of the above-mentioned points. Please feel to contact me for more info.
Problem: Hot water temperature too high, pipe/s making Hammering, thudding sounds. Only registered, certified plumbers' quotes will be accepted. Check thermostat & geyser pressure valve, set temperature to 55 degrees Celsius; In addition: Replace washers to bath, shower, kitchen sink, washing machine & dishwasher taps; Water Jet cleaning of water system. Secure any loose copper pipe/s. Please provide itemized quote for labour and part/s. Thank you.