I want to break out one wall to make provision for shower, needs a bathroom door to be installed, break out of existing wall tiles and floor tiles. Re-tiling of 2 small bathrooms to ceiling and installing of new floor tiles, new bathtub, toilets and vanity/basin combo’s, break out of current kitchen tiles, moving of current sink to washing room, smoothing of walls in washing room, new ceiling in washing room, breakout of few cupboards, instaliing of new cupboards which must be discussed, installing new floor tiles. Painting of house inside celings, walls, doors and skirtings. I do have all the taps, new bathtub, vanity/basin combos, tiles and toilets.
Bathroom 1 - total renovation of current bathroom (new bath, basin and cabinet, toilet and new shower to be built), add extractor fan & re tile - see photo attached (photo 1) of current bathroom and sketch of new bathroom. Bathroom 2 (on-suite) -changing the shower head to be higher(tall people), change individual water taps to a single mixer (dual taps don't mix water well at the moment), increase diameter of drainage pipe in shower (water clogs up very quick), re- tile the bathroom (photo 2) and add extractor fan. Add in cabinet/basin and mirror Build a wall closet in passage (linen closet) - refer to photo 3 - dimensions for cupboard -L: 0.6m, W: 0.87m, H 2.29m (just under the cornice) Build Built in cupboards on the wall - refer to photo 4 - dimensions for cupboard - H: 2,22m, W: 2,19m, L: 0.4m Build full length cupboards on the wall - refer to photo 5 - dimensions for cupboard - H: 2,27m, W: 3,m
We would like to request a quotation for a full renovation project on the ground floor of our property, including the following works: 1-Replacement of doors and windows with security-grade items on the ground floor 2-Replacement of floor tiles on the ground floor 3-Wall repairs, plastering, and painting throughout the ground floor 4-Renovation of built-in wardrobes, including the addition of new drawers 5-Full kitchen renovation 6-Full bathroom renovation Please provide a global price for the entire project, including labor and materials.ypushould bein the proximity of empangeni to apply
1. The worktop, cupboard and sink should be removed to allow access to the mould infected wall, which should be scoured, disinfected, waterproofed and repainted. 2. The entire cupboard under the sink, including the shelf and two doors must be replaced, as the damage is irreparable. 3. The sink cannot be repaired and must be replaced. 4. The entire affected worktop up to the joint with the worktop in the stove area should be replaced, as the damage is irreparable. 6.Once the worktop has been removed, the adjoining cupboards must be inspected for mould contamination and replaced if found to be water damaged or mould infected.
So this is a approximately m2 yard, with a small 2 bedroom with open plan kitchen and lounge with small bathroom space RDP house. The house is fully tubed. We want to build a 4 to 5 meter wall on all sides and a nice looking fence in front of the house. We also want to make renovations in all of the rooms i.e: New ceiling all over the house, the walls have cracks so we need plastering and painting, new aluminum windows(5) and doors(2), a small patio in front of the house, 2 one bedroom open plan kitchen and lounge backrooms and paving in most of the yard with a drainage for the rain.
We would like to upgrade our bush home at Rooiberg Private Game lodge next to Rooiberg. FOUR BATHROOMS & BEDROOMS - removal of existing floor and wall tiles and replace with new tiles (except in bedrooms - we will arrange floor coverings as per existing in other areas of the house.) - replace all toilets with Geberit Monolith toilets (4x) - replace basins in three bathrooms with Geberit or similar twin basins (3x) and one with a single basin (1x) - replace floor tiles in bathrooms and some of the bedrooms. Remove corner bathtubs in 2 bedrooms. - Upgrade existing showers (2x) and two new showers to replace old ones (2x) - remove and reinstall burglar bars and mosquito screens CHIMNEY - decommission chimneys and close chimney openings on top against bees BOMA braai area - build a new braai area with fire resistant bricks ROOF - service roof / repaint existing waterproofing ENTRANCE DRIVEWAY - cover with small pebbles after contouring the surface for storm water
I currently have a single story house and want a double story rooms on ground :guest bedroom with en-suite, guest toilet dining area, kitchen, lounge and double garage, patio and upper floor main bedroom with en-suite and walk in closet, 2 bedrooms with shared bathroom and toilet, lounge , home office and gym. My property is square meter. I’ve attached a draft plan that needs to be refined by an expert.
CONSTRUCTION NOTES: FLOORING: Remove ex. carpet tiles, make good to floor to take new carpet floor tiles (prime cost for supply, delivery & installation at R m² excl.vat) laid in accordance with SANS . SKIRTINGS: Existing skirtings must be re-used where possible otherwise 69 x 19mm harwood formed skirtings to match existing must be fitted between drywalls and floor. All skirtings must be sanded lightly and applied with 1x wood primer and 2 x coats Plascon Velvaglo gloss paint to manufacturers specifications. Colour: To match existing in all aspects.
Open plan kitchen area Put gas in (certified) with a gas stove Will be redoing kitchen with kitchen company Bathroom upstairs - install shower and ideas for bath options Tiling most of the townhouse upstairs / downstairs and on stairs Property currently in registration process as a new purchase
Demolition of the existing kitchen fittings; Installation of a 1-hour fire-rated ceiling board; Installation of aluminum-enclosed side walls and stainless steel door; Installation of an exhaust system (including ductwork); Provision of hot and cold water connection points and drainage points; Installation of sockets and lighting system; Installation of a stainless steel double sink unit; Installation of a gas piping system; Installation of a fresh air ventilation system.