Good day. The approved plans are attached. The eartworks are done and the engineers currently busy with the structural design drawings. I have attached photographs of the (before and after earthworks)erf in Capri, Fish hoek. Could you please provide an estimate for the project (turnkey). The area of the built is approximately sqm. Kind regards, .
I’m looking for a company that can do the following -complete tiling, 80% of tiling has been done -Do Ceiling the whole house -plumbing -electricity - landscaping -electric gate installation -aluminum window -touch ups on exterior wall and house walls inside and outside -bathroom and shower -toilet to be completed -open floor plan kitchen and lounge area - built in kitchen cabinets
1. Improve/remodel shower, install shower panel. 2. Remove all gutters, repair fascia boards where needed and repaint. 3. Install new PVC gutters and downpipes. 3. Replace stoep fascia front with Nutec and paint. 4. Paint whole roof with rubberized paint. 5. Paint whole house outside. House size about m^2
3 en suite bedroom and an en suite main bedroom with walk-in closet. A guest bathroom with bathtub and shower. An open hallway leading to an open plan kitchen with utlra-morden finishes and a scullery. A formal lounge or dining area and a informal tv or family entertainment area. A patio and double garage with a carport.
Hello. I am looking to renovate my apartment. This will include as a minimum: 1. Full refit of guest bathroom (swap bath with shower, complete re-tile and re-fit) 2. Partial Refit of master bathroom (complete re-tile, upgrade fixtures and fittings) 3. Grout, sink aircon ducting, waterproofing and re-tile large balcony 4. Construct concrete chair structure to balcony 5. Fix master bathroom sliding door that has come off tracks
I want to build a 3 bedroom house,with open kitchen and dinning room plus patio.
I want a building construction company which is registered with NHBRC,and will give me the certificates necessary for building my double storey house,which will be located approximately 15km from Polokwane town.
BATHROOM Removal of tiles Removal of toilet and basin Installation of bath, free standing. Tiling into cornice and floor Plumbing pipes on mixers etc Installation of cornice and painting. SHOWER Removal of tiles Removal of toilet and basin Removal of old shower door and cabinet Plumbing pipe on mixers etc Installation of cornice and painting Tiling into cornice and floor Installation of toilet, shower door, cabinet and vanity KITCHEN Installation of extractor fan only. ELECTRICAL Installation of new extractor fan switch for bathroom, shower and main bedroom. SPARE BEDROOM Fix wooden floor. Small portion. Rubbles removal.
We need to re model 4 lodge houses, making extensions, new badrooms, toilets, roofs, building a nice boma , new restaurant, bar area and new pool including deck. Tearing down a giraffe house and build it with new materials on a different spot. I only look for labor staff and a professional foreman who has experience
Dear Sir/Madam Kindly quote me on the below information Roof consists of corrugated iron sheets, with wooden louvres at the top (Figure 1) for air movement and Fasi boards, gutters, and downpipes on the edges. The building has a footprint of ±m2 (Figure 2). The roof, louvres, fasi boards, gutters and downpipes must all be prepared and covered with a Ccool Surface polymer/coating to allow passive cooling prior to PV installation.