1). Painting of Walls (internal) - undercoat and 2 coats at m2. 2). Painting of soffit (already with rhinolite plaster) 1 coat at 54m2. 3). Painting of ceiling board at 39.5m2 4). Painting of x3 new timber doors and frames with varnish (1 coat) 5). Painting of new double garage size timber door with varnish (1 coat)
I am requiring 4 outside doors, internal we already have. Quote for aluminum doors and windows, and wooden doors and windows. I will give the sizes when I receive the list of suppliers. I would like a quote on 2.1 sliding patio door by 2.1 in bronze. I would like the suppliers to make contact with me.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
The front door to my property is rotting and I need to replace it. The property is part of a sectional title so it need to be compliant with all the other doors in the complex. I have attached a picture of one of the other aluminium doors in the complex. It would be to fit and install a standard size front door. Measurements can be provided or you are more than welcome to go and measure the door. Looking forward to hearing from you. Regards,
Please I would like to have a quotation of a building that has a floor and ceiling that is damaged because of an air handling unit that is placed on top of timber floor. The ceiling below that floor is also affected. Please I would like to have the following in the quotation: 1. An investigation on the cause and extend of the water damage on the floor/ceiling. 2. On top of the timber floor there is a torch-on waterproof. What is the rate of the waterproof when it is removed and when it is replaced with new. Thank you. Kind regards,
1 Main bedroom (3 walls and 1 wall with window). 3 standard bedrooms (2 walls, 1 wall with window and 1 with wardrobes). Passage both sides. Living room (3 walls and one with sliding door). Reception room (3 walls and one with double window). Dining room (3 walls and 1 with window). Study room the size of a single garage (3 walls and 1 with window). Ceilings fir all those rooms. Ceiling needs some fixing. I need an estimate quote. Most of the walls are currently Grey and need to paint them cream or a homely color. Need quote to include the cost of the paint.
I am in need for someone to supply and install 2 external wooden doors. They must be experienced in this. one door opens outward and will need a strip down the length of the door that covers the opening to prevent the door from being forced open from the outside. Door frame size is cm x 81cm Other door opens inward to the loft room and is shorter than standard. frame size cm x 81cm Both doors have good hinges but need decent handles and secure outdoor locks. Good quality wooden external door but not decorative
The basement is humid and is smelling musty, the walls are flaking in one of the rooms. In winter, cold air seeps through into the ground floor because of the wooden flooring and the spacing between the floor boards. I want a cost effective, economical and durable solution like a fibre seal for walls and underflooring.
Need a double door opening to outside. Currently there is a wood and glass door and frame in the position, would like it replaces with aluminium and glass doors and frame. Measurement from where concrete wall meets wooden frame is cm high cm wide. See attached photo. I prefer being contacted via email or Whatsapp