Replace flat roof with pitched roof, concrete tiles, L-shape layout; supply all materials and labour. Use site-built trusses (mm centres), underlay, battens, valley flashings, ridge tiles. Include removal of old roof, transportation of materials, timeline, payment terms. Quote materials + labour separately.
We want to demolish the current wooden house and build a 3 or 4 bedroom brick house. The current house is very old. We want to build a house that is totally off the grid. Therefore. Solar panels and water tanks. There are already water thanks at the current property. The property is a double property on the beach side.
We have land in the rural eastern cape, in a small town called Herschel. We want to build a retirement home for my mother who will be relocating from CPT. The idea is to have a 4/5 bedroom house that will cater for her children and grand children. A double garage and detached patio are part of the requirements.
1. Remove bath and do a walk in shower. 2. Replace basin with a floating cupboard and basin. 3. Replace toilet 4. Add a wall cupboard with mirror aligning to size of floating basin cupboard. 5. Plan to add a broom cupboard. 6. Add a bigger extractor ceiling fan. 7. Wall and Floor tiling Cirrent view of bathroom attached.
I need to rewire circuit breakers and install a timer switch in my outdoor electrical box located at the swimming pool. It controls the pool pump. See attached photos. Please supply a quote for the necessary components, and labour. There appear to be 2 x timer switches already installed but not connected and don’t know if they are in working order.
A continuation of a build 3 bedroom house and an addition of a garage with a back room. A boundary wall would be great as well. House currently has a loung, kitchen , 1x bedroom and a seperate toilet and bathroom. There are also 2x flats with a toilet on car end of yard. The house has an existing plans ( 3 bedroom & 2 flatlets) approved by the Buffalo City Municipality ( my gran made sure). I am currently in the process of trying to get the copies as we don’t have them to share. Would be great to start this process with estimated costs.
Looking to build a 3meter high wall in Munster, South of KZN close to Port Edward. The yard is about sqm, but looking to go with a phased approach where we start with fencing or walling the back of the yard which is roughly about 4 to sqm (from the back to the sides of the house) or 12meters (only the back of the yard) to start. I need qoutes on a Palisades wall, PVC fencing or Bonnox Mesh Fencing with materials and labor included.
I have a 2 or 3-phase project with the primary objective focussed on the bathroom: Bathroom: - take out the bathtub - do waterproofing in preparation for, and install a walk-in shower - retile bathroom (floor, shower, walls - not certain of height of wall tiling yet) Living/kitchen area: - retile as initial installation was done poorly - most tiles are loose. Stretch/optional goal: - integrate battery inverter to unit's power supply The supplied/attached plan is what I came up with after several iterations of different ideas. It's not % final and lacks detail such as the shower floor slope, but should be sufficient to get a ballpark quotation (I think). The entire flat is 49m², the bathroom is about 4.3m², the living room/kitchen area is 16.5m².
Hello. I am based in Elandskop, Pietermaritzburg. Looking for a new building on a space with the following dimensions: the back is 8m, the two sides are 12m and 10m, respectively, and the front side is 6m. This is roughly 80-88 sqm. I am looking for a double storey with two bedrooms, a common area with a kichenette , two small bathrooms. See examples attached
- *Installation details*: - Install new copper wiring for lighting, socket outlets, and dedicated circuits for kitchen appliances. - Upgrade distribution board with modern circuit breakers and RCDs for safety. - Include proper earthing and bonding as per SANS standards. - Install new switches, outlets, and fixtures according to layout plans. - *Maintenance requirements*: - Provide a maintenance schedule for inspecting wiring and electrical components. - Include instructions for safe operation and troubleshooting of the electrical system. - Ensure compliance with local regulations for future inspections. - *Specific needs*: Need certified electrician with wireman's licence for compliance and safety. - *Timeline*: Completion within 2–3 weeks, with a follow-up maintenance check after 6 months.