I need to rewire circuit breakers and install a timer switch in my outdoor electrical box located at the swimming pool. It controls the pool pump. See attached photos. Please supply a quote for the necessary components, and labour. There appear to be 2 x timer switches already installed but not connected and don’t know if they are in working order.
- *Installation details*: - Install new copper wiring for lighting, socket outlets, and dedicated circuits for kitchen appliances. - Upgrade distribution board with modern circuit breakers and RCDs for safety. - Include proper earthing and bonding as per SANS standards. - Install new switches, outlets, and fixtures according to layout plans. - *Maintenance requirements*: - Provide a maintenance schedule for inspecting wiring and electrical components. - Include instructions for safe operation and troubleshooting of the electrical system. - Ensure compliance with local regulations for future inspections. - *Specific needs*: Need certified electrician with wireman's licence for compliance and safety. - *Timeline*: Completion within 2–3 weeks, with a follow-up maintenance check after 6 months.
We are selling our house and need to get a COC certificate, but the previous owners did a messy and elegal job of the wiring and falsified the COC certificate. It needs proper insulation in places e.g. the kitchen and cables running from house to little cottage accommodation in garden, tidying up in the loft, and an electric point running to the 3rd bedroom, and lastly...our ceiling fan needs fixing / new one reinstalled. I have blue print floor plans with plug points indicated of our property.
Hi, I built a tiny 26sqm home. Most of the electrical work is done, and only the earthing and circuit breaker still need to be installed. Also the underground plumbing is done, but the inside fittings (except for the toilet) needs to be done. I won’t be using a geyser, but rather want in instant heater. Can you kindly visit me to provide a quote to complete the work and furnish an electrical and plumbing certificate. Kind Regards Elsa
- *Planning*: Determine power requirements, create a layout, and obtain necessary permits. - *Rough-in*: Run cables through walls and floors to outlets, switches, and fixtures. - *Installation*: Install outlets, switches, light fixtures, and other electrical components. - *Testing*: Verify the system is safe and functional. Key considerations: - *Safety*: Ensure compliance with electrical codes and standards. - *Efficiency*: Plan for future upgrades and energy efficiency. - *Cabling*: Choose appropriate wire types and sizes for the application.
Install 6 x aircon units and have it gassed which will be supplied by us Connect electricity to 2 x containers Supply aircon material with 2 x brackets Supply & install 4 x plugs with and material bosal pipes wiring with breakers SWA 40mt cable for the 2x containers Supply cable & switch & breaker and consumables Install 9 x big spot lights supplied by us Include transport cost
We are a utility company supplier of prepaid electricity meters in Sandton, Johannesburg. We have installations in and around the Durban area from time to time and am looking for a qualified electrician that will work on a contractual basis for us to assist in the installation of the prepaid meters. Mostly residential installations.
Burglar guard measurements (L*W) . Ceiling 0.09m. Kitchen: Door= 2,02m*0,m Two windows =0.86m*1.05m and 0.91m*1.07m Living room: Door=0,82m*2.02m Window=1.49m*3.24m Toilet windows: 0.56m*0.54m (two in each toilet ie two toilets) Bedroom windows: 1st=1.49m*2.18m* 2nd (two windows) =1.49m*2.18m and 1.18m*0.56m 3rd (two windows) =1.49m*2.18m and 1.18m*0.56m Brown/dark brown color, Existing windows/doors need to be taken out and rubble removed from premises (include in cost if service offered-separately)
mm (w) × mm. (h) × 2 mm (w) × mm. (h) ×1 mm (w) × mm. (h) ×1 If angle iron 30mm. could be used straight accross at the top and bottom, square bar 10mm. Vertical accross mm. Appart. Square bar out from angle iron mm. Angle iron to have sufficient mounting holes. The mounting holes will be top and bottom only and the centre of these holes must be as measurement provided by hight above mm. from centre to centre across. Painted black and provided only. Excluding installation.
New istallation 3 bedrooms with 2 plugs each and lights. 2 bathrooms with lights . New DBBox for all. 3verthing must be inside the walls. Living area 3 plugs and 3 lights. KItchen 8 plugs including stove poibt and extrator van point. 6 outside ligjts spot ligjts with day and night. 4 pkugs in the gauragde with 2 lights.pOwer from eskom pole 60 meters away. Geyser installation