Full bathroom renovation for two bathrooms.Bathroom remodel. Remove all old file (wall and floor) and fitting (tub, toilet, basin). Replace with new fittings (walk-in shower, toilet, basin). Remove old floor and wall tiles, toilet, tub, hand basin. Replace with new tiles, walk-in shower, taps, basins etc Bathroom 1 - 22.5m2 , Floor 5m2. Bathroom 2 - 27.5m2 , Floor 7.5m2.
People came and ripped my copper pipes off the wall. I've replaced most of them except my kitchen tap pipes. I'm wanting to change them to polycorp pipes connected to the previous copper pipes that I've replaced. You need 5 corner pipes with piping and a T pipe and 1 galvanized/copper pipe that needs to go through the wall.
Remove old network point cable and put new point full installation, please.
Connect an inverter to a DB board.
Installation of tower battery
External & internal taps removed
stove plates dont work and oven burns food
Water leak in one of the pipes