Conducting Bathroom Renovation Project for a 2.5 bathroom maisonette apartment. Aprtment has 2 upstairs en suite bathrooms and a powder room (toilet and sink) in hallway. Need experienced contractor/plumber to perform all 3 bathroom upgrades (plumbing, fittings tiling). All materials will be provided and no designing is needed. Hoping to begin work as early as the week of April 17th. Only considering experienced contractors with strong references and images of past work where bathroom was designed and fitted. Can provide a more detailed brief and plans and schedule walk through and measurements week of April 10 - 17. Thank you for your interest!
I had a corner bath but got someone to take out the bath and make it a shower, but now my wall is rotting all around the shower so I need everything taken out and I need a built in corner bath again. I am also thinking of retiling the whole bathroom, because of the walls rotting around the shower area.
I need repairs to the roof, design and installation of ceiling, installation of chimney cover, installation of floor tiles, installation of wall tiles in the bathrooms, plumbing, installation of building in wardrobes, installation of building in kitchen unit, installation of bath tubs and flush toilets
I currently have an older flat that I am looking to do a full remodeling on. This includes painting etc. But I wish to focus on the bathroom in particular. The bathroom currently has a shower installed, I would like to know what it would cost me to have the shower removed and a bath installed instead with shower facility as well.
Require quotes for a bathroom and separate toilet renovation atm. Once the building plans are in place and approved, we would require quotes for an external granny flat/garage conversion also. Afterwards we would like to also renovate the rest of the main house, but all to happen is stages/phases due to people still occupying the premises.
The client requires 2 bathroom renovations. Bathroom 1 is 7sqm and includes the adjoining of the common bathroom and toilet by demolishing the existing wall between the two and bricking one of the doors. The bathroom will include a new bath, shower, hand wash basin/ vanity and toilet with new plumbing to exterior wall. new tiling and
We live in an older house. Our washing machine is working quite well, but we need someone to come out and check because our washing sometimes comes out with yellow-ish or orange stains. This also happens in the sink as well and because it is several spots in the house - I think it could be a problem with our pipes. They could be rusted.
I want to do full renovations on the kitchen and the bedrooms. This includes kitchen cabinetry, flooring, etc. I am currently in Cape Town but will be returning to the property in round about two weeks time and would like to arrange site visits from the 30th of June to discuss and answer any possible questions.
Heritage House that needs to be repainted the roof , kitchen to be done at commercial level it about 12 sqm , the floors a wooden deck like floors most needs to be repainted and about 20 sqm needs to be replaced. Verandas of about 80 sqm needs stoep resurfacing. Tiling of another sqm indoors including 3 bathrooms . About 45sqm of roof rafters and zincalum to be replaced and painted green. About sqm of painting. The project will be government funded and from experience it takes about 7 days for invoices to be paid
I need a small single wall built and two bare walls plastered. I need two doors installed. I need the remaining walls cleaned up and skimmed. And then a little bit of patching and fix-up. Once the walls are ready we can discuss future work like painting, tiling, waterproofing and installing a shower, etc.