Claim it for free and start getting requests from customers in your area.
Claim profile for freeremoving the bath Removing 2 x 1 metre partition walls. changing 2 underbasin cupboard doors with drawers increasing shower area and removing door and replacing it with a glass panel installing a hand held shower while retaining the overhead shower retiling installing shower seat repairing bide plumbing connection
APARTMENT RENOVATION SCOPE OF WORK Property: 2 bed 2 bath toilet turned laundry .sunroom the length of bedrooms. Sunken lounge , step up from lounge to dining room opening and step down into sunroom Apartment, Musgrave size sq m General Requirements •Remove all rubble from site. •Protect common property areas and lifts during construction. •Supply all labour, materials, fittings, disposal, and making-good work unless otherwise specified. •Provide separate pricing for each section where possible. 1. Entrance Front Door •Inspect existing front door. •Provide quotation for refurbishment of existing door. •Provide quotation for replacement of existing front door, including locks, handles, hinges, and all associated ironmongery. Entrance Transom Glass •Remove existing transom glass. •Supply and install replacement glass. •Provide frosted/privacy glass options. 2. Entrance Passage Decorative Glass Tile Wall •Remove existing glass tiles on the left-hand side of the entrance passage. •Prepare wall surface. •Skim and paint wall. •Make good all surfaces after removal. 3. (Passage Bathroom) Demolition •Remove existing shower. •Remove one existing basin and associated plumbing. Alterations •Install bath in position of existing shower. •Modify plumbing as required. Existing Fixtures to Remain •Existing toilet to remain. •One basin to remain. •Existing hand washer to remain if in good condition. Finishes •Full wall tiling. •New floor tiling. •Replace fittings where required. •Regrout and seal all tiled areas. 4. Main En-Suite Bathroom Refurbishment •Existing layout to remain. •Existing toilet, basin and shower generally remain. Finishes •Remove existing wall and floor tiles. •Install new wall and floor tiles. •Replace mixers and accessories if required. •Regrout and reseal all tiled areas. 5. Kitchen Renovation Demolition •Remove existing cabinetry. Check if it can be re used •Remove existing splashbacks. Countertops •Assess existing granite countertops. •Lift and reinstall existing granite where practical. •Provide alternative quotation for replacement countertops if required. New Kitchen •Supply and install new kitchen cupboards. •Soft-close drawers and doors preferred. •New sink and mixer. •New splashback. •Improve storage and functionality of layout. Electrical •New plug points where required. •Provision for under-cabinet lighting. 6. Flooring Throughout Apartment Existing Flooring •Remove all existing flooring finishes. New Flooring Supply and install wood-look ceramic or porcelain tiles throughout: •Entrance •Passage •Lounge •Dining Room •Bedrooms •Sunroom •Kitchen •Laundry Room •Bathrooms Flooring Specification •Oak wood-look finish. •Matte finish. •Large plank format preferred. •Matching grout colour. •New skirtings where required. 7. Laundry Room (Former Toilet Area) Refurbishment •Remove unwanted fittings. •Retile floors. •Retile walls where required. •New plumbing connection for washing machine. If necessary •Install cabinetry and storage shelving. •Prepare and paint remaining wall surfaces and ceiling. 8. Painting Full Apartment •Repair cracks and imperfections. •Prepare all surfaces. •Prime where required. •Paint walls. •Paint ceilings. •Paint doors and frames. Optional Items (Price Separately) 1.New lighting throughout apartment. 2.Downlights to passage, lounge and dining room. 3.Bathroom mirrors. 4.Built-in cabinetry in sunroom office area. 5.TV feature wall in sunroom. 6.New internal doors and handles. 7.Air-conditioning provision. Contractor Request Please provide: •Labour-only quotation. •Labour and materials quotation. •Separate pricing for: •Bathrooms •Kitchen •Flooring •Painting •Electrical work •Plumbing work
My three drains outside are overflowing with water filled with waste and toilet paper sludge.One toilet is struggling to flush properly,the water in the toilet rises to the brim of the toilet the falls without flushing the waste inside the water. When I flush the main toilet the other toilet makes noises and the water rises(i think it is because the pipes/drain is shared.I tried putting 4l drain cleaner acid into th
Hello,complete new roof with zinc sheeting. Harvey tiles to top off.I have a Facebrick outside,with advice it can maybe be painted.Gutters downpipes to replace. Need 2nd bathroom from 1 of the bedrooms.Existing bathroom to be made new. Scullery area to be extended from back of house. Back boundary walls to be plastered painted etc All windows to be replaced with laminated windows.Existing garage to be made into cottage. Driveway to be extended upto motogate by carport or traditional garage style. Entrance to front of home to be remodelled Front boundary wall to be made stronger n safer. Floor outside of home to be paved or tiled. All plumbing pipes taps electrical to made new
Converting a double garage into open plan. Bedroom with en suite bathroom, and living space. Have newly built double garage, would need to remove garage door, fit an aluminum door and large windows. New laminated flooring, bathroom with shower, basin with vanity and toilet. Will need 4 plug points, lighting for bedroom, living room and bathroom. Ceiling fan. Built in cupboards, 2 door shelving, 2 door hanging space. Would need Ceiling installed but would like to fit between existing trusses to keep the Ceiling volume.
En Suite bathroom: Complete removal. New toilet, vanity with drop-in basin and walk-in shower. Toilet and basin will need to change position. Ceiling to be replaced due to mold. Main bedroom - fix damp on wall from shower. Replace cupboards. Smooth walls and paint. 2 x bedrooms - Replace cupboards. Smooth walls and paint. Smaller bathroom: complete removal. New toilet, shower bath and vanity with drop-in basin. New cornices only. Passage: Tiling and new cornices. Smooth walls and paint. Lounge: New ceiling. Smooth walls and paint. Tiling. Kitchen: Complete removal. New cupboards. No major layout change. Tiling. PG Bison Mellawood for cupboards and ProQuartz counter top
Good day... My bathroom basin seems to be clogged up when open tap. I have open pipe under basin n cleaned pipe. The blockage is from outside pipe.. I tried with hosepipe worked a little but water is not running down drain. Along pipe line is blockage which needs to pushed with rods n with force It's literally 5 min job which just requires rods to push or pull dirt out
Kitchen - Install new cupboards, Retile, Paint. 2 x Bathroom - Retile, Paint, Install new Shower, Bath, Basin and fixtures, will require demolition of current Bath and Shower. Bedrooms - Retile, Paint. Patio - Demolish wall to create an open space between sunroom and patio, to install built in braai. Retile house throughout, roughly m2 (including bathroom, kitchen and bedroom renovation).
Over flow is too heavy on the geyser and the geyser is making a big noises all the time if possibly can the geyser be disconnected and a new geyser can be installed outside where my heat pump is which is currently is also disconnected from the geyser because they could not connect it is it possible use those legs or holdings to keep the geyser in place and use the heat pump copper pipes for the new geyser pls help urgently like today I’m available 24/7 on my phone
Vandalised building requiring to be cleaned up / White Boxed. Ceilings ( suspended ) to be repaired. All electrical to be re-installed , i.e. wiring, plugs , light switches, light fittings, DB board etc. All plumbing , pipes, taps etc to be re-installed. Door locks etc exterior site clean-up.