Top 20 House contractors Bluff, 2026
Related services in Bluff
Frequently asked questions
-
What do I need before I start building a house?
Before starting to build a house, you must have: a site plan, layout drawings, a fire installation drawing, drainage installation drawings, particulars of any existing building or structure that is going to be demolished (and you need to state how it will be demolished), and any other plans and particulars that your local authority requires.
-
What is NHBRC and why do I need it?
NHBRC is the National Home Builder's Registration Council. Its function are to keep a register of home builders, oversee the construction of residential homes to see to it that proper building standards are adhered to and to provide a warranty service for major structural defects. Any new build in SA requires you to have NHBRC registration.
-
What should a construction contract include?
The construction contract should include at least: the name of the contractor and contact information, the name of the homeowner and contact information, description of property in legal terms, the cost, description of the work, the completion date and the right to stop the project.
2026 House contractor costs
Top House contractors in South Africa
- Amanzimtoti - House contractor
- Arboretum - House contractor
- Ballito - House contractor
- Durban - House contractor
- Empangeni - House contractor
- Essenwood - House contractor
- Glenwood - House contractor
- Harrismith - House contractor
- Hibberdene - House contractor
- Hillcrest - House contractor
- Howick - House contractor
- Kloof - House contractor
- KwaZulu-Natal - House contractor
- La Lucia - House contractor
- Ladysmith - House contractor
- Manaba Beach - House contractor
- Margate - House contractor
- Meer En See - House contractor
- Morningside - House contractor
- Mtunzini - House contractor
- Musgrave - House contractor
- North Beach - House contractor
- Pietermaritzburg - House contractor
- Pinetown - House contractor
- Port Edward - House contractor
- Port Shepstone - House contractor
- Queensburgh - House contractor
- Ramsgate - House contractor
- Richards Bay - House contractor
- Scottburgh - House contractor
- Sheffield Beach - House contractor
- Shelly Beach - House contractor
- South Beach - House contractor
- St Michaels On Sea - House contractor
- Umdloti Beach - House contractor
- Umhlanga Ridge - House contractor
- Umhlanga Rocks - House contractor
- Uvongo - House contractor
- Westville - House contractor
- Zimbali - House contractor
House contractor - Featured articles
Building project gone wrong? How to rescue it—and the right Pros to finish
Planning an extension: foundations, slabs & costs—a 2025 guide before breaking ground
How much does it cost to build a house in South Africa in 2025?
Recent jobs for House contractors, Bluff
Large house extension with multiple rooms and double story
Currently house is below street level and I want to remove d bank and build from d front to join d rest of the house to incorporate a bathroom kitchen and lounge plus having potential car park above as well as go into double story dwelling. plans is in the making
Driveway paving, wall repair, and veranda tiling
I have bought a home and should be ready to move in around March April . I will need the driveway paved and one of the restraining walls redone as well as my veranda need to be restored with some economical tiles
Multi-phase residential construction project
We have plans for a multi phase product with various building works needed. Phase 1 - Conversion of double garage into a small flatlet (marked gymnasium on the drawing attached) the drawing only indicates requirements to pass the plans, but we would need all the additionals such as kitchen cupboards, BIC in bedroom and plumbing done (we have our own electrician) Phase 2 - Conversion of outbuilding into small bachelor pad (marked storeroom conversion on the drawings). here it would be the same as per the Garage conversion with less tilework but all the Sanware and plumbing included. The plans for this section will likely change a bit, but the general idea is indicated on the drawings. Phase 3 - Newly Built staff quarters. This will be a complete build from foundation to roofing. Due to the slant of the property the unit will likely be build on a platform or dug out to level the ground for building works. Phase 4 - Yard work. there is a tar driveway that needs to be extended into the property with parking bays. there is also 2 precast concrete walls to put up (10m and 18m approximately) as well as an existing parking bay needing renovation. Please could you be so kind as to provide estimates and quotes divided into the phases of the project so we can make decisions on the order of the phases based on cashflow and budgets.
Construct a single-story storage room extension
We need to extend the one room - one long building for storage space.
New build of a 4.3 meter room
I would need a 4.3 meter room. I have building materials. Preferably like the picture.
Full renovation of a large house over 300 sqm
New build house over 300 sqm with 4 bedrooms and 4 bathrooms
Required, 2 bedrooms, kitchen, lounge, bathroom & toilet x 4. Two downstairs & 2 upstairs. Parking space for 4 to 6 cars.