1) To remove the retainer blocks in question against the precast fence between units 2 and 3. 2) To excavate and pour a 25 MPA concrete foundation. 3) To construct a new 1, high wall as close as possible to the precast wall – face bricks to match the existing walls and common bricks to be used behind the face bricks. 4) To remove the existing paver blocks at the proposed new position of the spa - bath - to lay the above blocks elsewhere as required by the owner. 5) To lay a level mm thick 25mpa concrete slab on top of BRC mesch – size of slab to accommodate the spa-bath. The edges of the slab are not to protrude more than mm from the edges of the spa – bath.
I need to replace a corner bathtub in the main bedroom. In the other bathroom, I would like to remove the shower and install a bathtub and fix the toilet that needs the mechanism to start working.
Alterations, additional garage and flatlet complete new renovation inside, tiling, ceilings, bathroom etc, modern look
Student Accommodation. A triple-storey building with nine rooms per floor. Each room should have a kitchenette, bathroom and three separate bedrooms. A separate storage area outside and a reception area next to the storage area.
Re-build wall
We require a complete renovation, meaning here's work for all trades. Nhbrc, project and trade certified contractors will be accepted only.
Will you please give me a rough quote per square metre to build a new house. Face brick outside, plastered and painted inside, corrugated roof, aluminium windows
I have a small outside room which we currently use as a laundry room, I want to extend and remodel this room into a small granny flat with a bathroom.
We want to build sqm in Kleinbaai. With a loft for a bedroom and bath room.
I want two bathrooms sets and installation