Building that has been vandalised. Building has 3 separate offices Building will be use for coffin manufacturing.
I bought the house in February . I want to install solar, etc. But need the Electrical COC to go forward.
Installation of network points
Swap out of existing Samite 20A circuit breaker, for a 40A breaker on the stove circuit
1.Replacement of daynite switch 2. New installation of plug socket x1 3. New light switch. 4. Single phase distribution board 5. Single phase stove circuit. 6. 60A isolator 4x4 7. C.O.C single phase. 8. 1x Electrician per hour 9. 1x labourer per hour
4 double plugs points, 3 light’s points, 1 Gyser and 1 db box and coc
Certificate of compliance
+- 25m electrical cable to be install and connect. Trench need to be digged with a few paving to be removed