sq/m - Open plan Lounge, Dining and Kitchen. 3 Bedrooms with the main having an en-suite. A small room for study. Kitchen back door should be a double glass aluminium door
Nutec building
Black
Building house
I am a professional painter, been in the industry for year's now. We start with preparation, were prepare the wall by first scrapping the Wall's, closing the wall with polyfil, then sand paper then remove dust from the wall after completing closing the cracks and holes, sandpaper and removing the dust we apply our primer after it dries we apply our first coat, if the wall doesn't require second coat we apply our finishing coat
Our jetty was damadged by strobg winds. It cknsists of three parts: fixed platform, a walkway onto the floating jetty. bracjets, and beam conections need to be replaced. Most of the railings need to be replaced. Many of the floor planks need to refastend or to be replaced. plaesant on the edge of the Groenvlei lake, just off the N2 on getting to Sedgefield.
The lounge, the passage, the kitchen and one bedroom and bathroom and toilet, the walls and the ceiling has to be painted.
Okay
Corrugated roof needs painting. Sanding where necessary.