I need 8 x W pannels installed, i have a 8kw Deye inverter with Revo 5kw battery(already installed)
Fridge repair; it stopped cooling contents. It is a French door with 2 bottom drawers as freezer
I need someone to test all the circuits to find out what is causing so much electricity usage. 2 bed townhouse with electric stove and geyser.
Need a COC to instal solar
provide and fit a change over switch and a socket on the DB board to be able to connect a generator when needed
Household use: Main use (Eskom to stay connected in case of unforeseen failure of Solar energy supply system) : 1. To run all household appliances and lights 1.1 geyser ( litre) 1.2 electric stove (big) 1.3 two(2) big fridges and 1 medium freezer 1.4 fourteen (14) 30w flood lights 1.5 ten(10) 15w lights 1.6 thirty(30) down lights 1.7 six(6) fluorescent lights NB. The whole house must run on Solar System 24/7. However the Solar System must be connected to the Eskom grid and if for some reason the Solar System experiences some immediate failure Eskom to automatically kick in without any disruption. System should be built on a free standing structure, exclusively built for the Solar System panels.
Stay connected during load shedding
My house runs on 3 phases , i have a 3 bedroom house, so 1 phase on the circuit board just died , had alot of issues after that , what is the cost to do a complete overall , or install a new circuit board. Thanks