we have seen a plot large m2 in Marloth Park We are from the Netherlands and are unfamiliar with the process in Africa.We are looking at a house with 4 bedrooms. 2 master bedrooms with shower toilet double sink- 2 slaapjamers with shared bathroom and seperate toilet. house with thatched roof, functional kitchen not large, living room max 30 m2 you live outside, large terrace with piece of canopy and pool with steps and seating. simple carport functional and beautiful, good driveway/entrance these are the starting points. Have you maby examples we ourselves do have kind of examples see photos
The House is 3 bedrooms, 1 living room, a kitchen, a toilet, a bath, and a Garage. I would like to a convert the living, the main bedroom and the Garage in Bachelor with 3/4 bathroom and a kitchenette. Then, the kitchen is to be remodelled as a Bachelor with only a 3/4 bathroom. An outside door needs to be opened in one of the rooms. Both rooms need to be linked. The toilet should be converted into a 3/4 bathroom. The shower needs to be converted into a kichen, to be shared between the connected rooms and a Bachelor.
I’m looking to build a multi residential property as an investment and looking for ball park figures I’ve found land varying from m2 to m2 We can have a chat on how many units are realistic for the space I have found and see ball park figures for building I’m currently in the process of selling a property, which will fund this project
Double storey houseDining & seating room open plan including kitchen with scallery, master bedroom with closet and ensuite leading to sunroom with cladded glass door, 2nd bedroom and general toilet separate. Upstairs - 1 bedroom with ensuite, entertainment area leading to outside balcony with cladded glass door. 6x3 swimming pool , pegola built next to it
Hi. What would the cost of a 6 by 10m turn key nutec house, with a wrap around porch be? As per the picture but on a concrete slab foundation, with skirting covering foundation to make it look like the picture. Pitched roof Lounge, open plan kitchen(fully fitted with washing maching plumbing attachments) 2 bedroom, with en suite each (shower basin, toilet) Electrical and plumbing Built in fireplace with bricks (braai) in the lounge Attached carport at back of property Cavity(insulation) walls
building blocks 4 ton building sand 3ton crusher run 4 ×mm building brick force 4 × 3,6m big six roofing sheet 3 × 3m**50mm beam 20 building cement 42.5N 2kg mm roofing nails 1kg 4inch wire nails 1 × concrete airbrick 1× pvc airbrick 1 × door mm 1 × 1.2* 1.5m aluminum window 1× 2m*mm lintel 1× 1,2m*mm lintel 10m of 3mm roof wire
We would like to extend the size of our house by adding 2 additional bedrooms and upgrading one existing bathroom. We dont any plans and would appreciate assistance and guidance on how to extend the size of our house. We are also open to converting new 2 bedrooms into a double story loft or section. For example, extend by one bedroom on the ground and the second bedroom on top of the first bedroom.
Good day. I want to brake open the dining room wall and build a 7m x 4m braai room onto the house. The braai needs to be removed from the patio and sealed. The window that will be removed need to be used on side of the new room. The other side needs a sliding door that will go out to the pool area. I need a wall build on the patio to make 2 rooms. The one sliding door that will be remove will be replaced with the window of the one room that will become bigger. The one room on the back needs to be extended with a meter. So, it will be plus minus 35sqm project. I need quotes to see what I need to budget for as I want to start this project in January
I need your assistance with obtaining a house enrollment certificate. I was approved through the Zakhelikhaya subsidy application, and the funds have already been paid to Cashbuild for me to collect building materials. However, they require me to have a house enrollment certificate before I can proceed. There are over 90 of us who were funded under the same program, and we are all currently stuck due to the same issue — none of us can move forward without the house enrollment certificate. Once we get the house enrollment certificate we can move forward and build houses. Thank you in advance for your assistance.
My eldery gran lives in our stand alone beach house. She struggles to move around so want to put up around five wooden railings around the areas she most frequently walks and needs more support. Then I'm also looking at getting a quote for taking the tub out of her ensuite bathroom and puttin a walk-in shower in there.