Claim profile for freeWe need a few services: Our block was constructed in and is very dated, Mount Curtis in main road in sea point. 1) 6 apts are incorporating old store rooms into their apartments. We need as built plans for each apt. Paid for by Corp and recharged to relevant owners. 2) 4 apts are applying for licenses to use roof areas and these x4 apts are required to measure the roof areas they wish to use. Owner expense. 3) Parking spaces have been re-jigged and allocated within the complex on BC land. We require updated, measured plans. BC expense. We are budget conscious - this is not a fancy block (sadly) but do have frequent requirements for architectural plans as we move forward. Thank you, Katie (Chairperson BC)
We want a single story house 3 bedroom- main bedroom with shower and a bath tub and closet and the other bedrooms with a shower, basin and toilet each. The house should have a study area Outside room with small bathroom (with stove and sink connection-kitchenette) Open plan kitchen and lounge + dining area. With a fire place. Guest toilet. Separate TV or man's cave it needs to have a nice covered patio.
Here’s a short WhatsApp version: Good day, I would like to request a quotation for a steel and alloy sliding driveway gate. Specifications: Type: Sliding gate (high security) Width: ±6.0 m Height: 2.1 m Material: Steel & alloys Finish: Anti-rust / powder-coated (if available) Please include price, installation (if available), and lead time. Thank you.
Hi, we are having a opening from about 14:00 in the afternoon, with 30/40 guests. as the guests are mostly men, contractors - I was thinking burgers, chicken fillets / garnish / sauces. we would need waiters to clean and serve the burgers, and a barman - we will supply the drinks. We are situated in Heriotdale JHB.
My husband's permit expired 12yrs ago.we need ur help.we did tried to renew but is rejected from there we were not able to renew but we tried a lot.even my two children they were suffering to get birth certificate till my sister helped me. One of immigration officers advised me to write a good cause letter.i don't know how to write it. Please i need ur help.
Location: Zonnendal Project Type: New residential home / Plot-and-Plan (open to recommendations) Erf Size: Approximately m² Required House Specifications: 3 Bedrooms Study 2 Bathrooms Double Garage Living Room Dining Room Kitchen and associated areas (including scullery/pantry if recommended) Single-storey design Approximate house size: –m² (open to recommendations)
I need the labour costs only for an 8m2 bathroom : Removal of bathtub, toilet, washbasin, shower wall and shower enclosure (shower is 1.2*1.2 and 2m high) Removal of current floor tiles and wall tiles (wall tiles are currently 1/2 way of the walls) Reroute 3m length of pipes (including chasing the wall for about 3m long). Install new freestanding bath (I already have all the materials, fittings, traps, etc) Install new bathroom wall mounted cabinet with basin Install new shower screen (no walls required) Install new toilet in current position Retile with 1.2*1.2m large porcelain floor tiles Retile floor to ceiling wall tiles with * tiles Install all plumbing, hidden mixers, taps, shower arm and head.
I have 4 x standard interior doors that I want to replace with new doors (Swartland Kayo Toledo Single Timber Interior Door Deep Moulded Classique Design x mm). Work to be done: 1. Removal of old doors 2. Trim new doors to size 3. Fit new doors to existing steel door frame (re-use existing hinges) 4. Fit hardware: Lock assembly & handles 5. Paint doors flat white
My three drains outside are overflowing with water filled with waste and toilet paper sludge.One toilet is struggling to flush properly,the water in the toilet rises to the brim of the toilet the falls without flushing the waste inside the water. When I flush the main toilet the other toilet makes noises and the water rises(i think it is because the pipes/drain is shared.I tried putting 4l drain cleaner acid into th
My husband and I have been married in community of property for 20 years and have 3 beautiful children together. IlWe also work together in the family business as both Directors and the founder of that business is his Mom and I’ve been working there since the year . We also own a house together and the house is registered in both our names. We have 4 cars.