Claim it for free and start getting requests from customers in your area.
Claim profile for freeElectrician installed a 12kw deye inverter onto 6x10kw fivestar luthium batteries in parrelel series. He did not install any busbar but he state that his settings are according to specs. I have googled and according to them the system needs a busbar. You can phone me also, but I would like somebody to visit me for a quote.
4 ROOM HOUSE, 3 REFRGERATORS,WASHING MACHINE,DISHWASCHER.TUMBLE DRYER, SWIMMING POLL, GEYSERSX2 0N GASS, STOVE PLATE ON GAS, STOVE ON ELECTRICITY. 2 TV. 12 OUTSIDE LIGHTS. ELECTRICAL DOOR, 3 BATHROOMS, TV ROOM, SITTING ROOM, BAR AREA, STUDY ROOM. WANT TO GO OFF THE GRID IN FULL.NEED 14KW ??. FLAT ROOF CORRUGATED ROOF, IN NELSPRUIT EXT 5 HART BEES 4
OPTION A — Minimum 8kWp solar + 8kW inverter + 15kWh battery OPTION B 10–11kWp solar + 10kW inverter + 20kWh battery OPTION C 12kWp solar + 12kW inverter + 25kWh battery We are currently using R electricity a month but want to install a separate entrance with separate geyser as well as adding a heated pump inverter to the pool.
I need a quotation to complete construction of a 6-room single storey residentitial house Current stage: Walls are built with concrete blocks. There is a roof plastering and flooring but no windows, doors, electrical, plumbing yet. Intended use: Primary family home Rooms: 5 rooms - [3 bedrooms, 1 bathroom, 1 kitchen , 1 dining+ lounge open plan. Construction: Concrete block walls, columns in front. Roofing material on site: IBR sheeting. Scope of work needed: window and door installation, plastering inside + outside, electrical wiring, plumbing, ceiling, painting and finishing. Timeline: I'm flexible on start date
At the moment, I have 3 × W solar panels on my roof that are currently being used to run my geyser. I would like to move these panels onto the garage roof, which has a flat IBR roof. The sun-facing section of the roof is approximately 3, mm × 8, mm (3.5 m × 8.5 m), and this is a tiled roof
We need a quote for installation of our Solar System! We relocated from and removed our solar system and batteries but left the solar panels behind. We now want to re-install the old 5kW Inverter and connect it to our DB box and to our 3x batteries. Additionallt, we would like to buy 6 solar panels to be installed on our roof. This will be an Off-the-Grid installation.
Please quote to reconnect my existing solar system to 2 separate strings connecting to separate MPPTs on single phase 8kW Deye inverter. Also want to replace the existing DC and AC combiner boxes, upgrade wirinf in DBs to make the installation fully compliant for CoC issuance. Home is supplied with3-phase electricity. If this is something you are qualified to do, please give us a quote
* Solar Panels: 12 x Tier-1 Monocrystalline Modules (W+ e.g., JA Solar, Jinko Solar Tiger Neo, or LONGi). * Storage Extension: 1 x Additional matching Hubble 5.12kWh Lithium Battery (to be balanced and paralled with the existing unit via BMS). * Mounting Structure: Electrical & Engineering Specifications: * PV String Configuration: Due to the inverter’s short-circuit input current limits, the 12 panels must be split into two balanced, independent strings of 6 panels each, utilizing both MPPT 1 and MPPT 2 trackers * DB Board & Aux Circuit Routing: * The retrofitted 2kW geyser and the pool pump must be rewired out of the main circuits and connected directly to the inverter’s Auxiliary (Aux / Smart Load) output. * The inverter must be programmed so that the Aux port activates only when the battery is full and excess PV overhead is available. * Configure an "On-Grid Always On" profile for nighttime fallback to the grid, ensuring these loads never pull from the battery storage bank during outages or low-light hours. * * Essential Loads: Ensure security lights and basic household baseline circuits remain connected to the Essential backup output. * Supply and integration of all necessary AC/DC surge protection, fusing, and isolators. * Issuance of a valid electrical Certificate of Compliance (CoC). * Assistance with municipal registration/sign-off paperwork for City Power / Eskom grid connection compliance. Please provide an itemized quote detailing hardware costs, electrical consumables, labor, and engineering fees.
I require a system for a 8 bedroom house, been tested monitored for wattage/ unit use over two weeks now in the winter. Recommend 10kva minimum system. 11kv or 12kv system I think with minimum of two 5.12 batteries, 14kv battery 12 panels to 14 panels. I have used Ecco before no problems. I am a pensioner so don't req Sunslyke. I will be looking at independent reviews. I am old school, I mean and do what I say. Thanks let's take it from there.
Upstairs : 2 Bedroom, Small Kitchen Dining Room and lounge ( only one person living here) Downstairs Flatlet - 1 Bedroom with small living are and kitchenette. Geysers are already gas Stove is gas Appliances: 2 x Fridge/Freezer Combo 1 x Internet 1 x Laptop 2 x TV 1 x Alarm System 1 x Gate Motor 1 x Security Camera System 1 x Washing Machine Kindly send me a Quotation with batteries that can possible run (without sunshine) for 3 days.