I would like to renovate a non functional 3bed house. The 3 bedroom house has 2bedrooms on the right side, one in the middle. I wanna * move the 2 bedrooms to the left side, 1 must be ensuite *make a double garage on the right side where the bedrooms were * and a backroom or 2 the back if there's enough space There is no existing plan
Build 6 x 18 m double brick wall (concrete bricks ) 1.2 m high with foundation fill up with soil on site compact and thrvaaldamough mm concrete top to be used as deck service supply all material to site. vaaldam. Can you give qoute indication new site no building constrictors resonde farm land decided into 2.5 ha plots
Whatsapp or email - preferably Whatsapp communication please. To replace faulty and leaking stop cock. This is the main water supply pipe to our unit in a complex. Water supply to complex must be turned off , so that the stop cock can be replaced. I've done renovations to our flat ,and discovered a ancient, faulty stop cock. The stop cock is leaking and is on the main water supply pipe to our unit. We need to replace this faulty stop cock, and fit a new one. The problem is that we need to turn off the water supply to the complex, replace the stop cock, and return the water supply.
Project in early stages of planning. NPO being registered still. Existing structure in Bokkie park will be extended out towards the dam. same dimesions as existing structure. 21m long by 6m wide. We will enclose existing structure and build kitchen and bar. Extension will be enclosed carport basically with big sliding door openings facing dam. This will be for seating. On the far end next to bathroom a office and additional bathroom will be constructed. All bricks for walls and IBR sheeting for roof. Existing roof does need some patching.
Toilet is not flushing properly. It only flushes when I open the clean out pipe and let the air out. The last few days even that is not helping to make it flush and the drain fills up. Solids take forever to flush down. Water level in toilet drops and it makes a glugging sound that goes on until I open the clean out pipe.
We need a Compliance Certificate as we have sold our house. The following repairs need to carried out; -Tighten x2 packing nuts outside. -Replace x1 hand shower rose, (downstairs). -Service shower taps. (ensuite) -Replace x1 hand shower hose swivel. (upstairs bathroom) -Remove and replace 15mm poly cop front of house and court yard. -Add x1 kitchen mixer head part sleeve. -Install R1 lagging on hot water line 3m Install R1 lagging on cold water line 1m Install R1 lagging on tp overflow 1m -Replace 40mm drip tray overflow to 50mm pvc. -Replace 15mm poly cop to 15mm cobra for prv overflow. -Saddle pipes correctly in roof space. NOTE: upstairs bathroom has a mixer that needs replacement. Client has already bought one
EMAIL ONLY Work to be carried out for Compliance Certificate: Kitchen Replace 3 lever switch - cracked modules Living room Replace plug behind TV - Stuck shutters Garage Rewire garage motor plug. Currently on twin flex. 6m and install 4x4 wondabox and plug. Upstairs living room Replace fused 12v globe Replace plug at wall near steps Stuck shutters Upstairs bathroom Install 5amp isolator for extractor. Fan not running not part of compliance. Check for power. Ensuite Install x3 stream proof fittings down lights Room off ensuite Replace plug under counter and check earth connection Balcony Replace 4x2 plug - rusty. Outside back Replace 4x2 rusted plug in s15 box Roof space Install push gland at round box Install x3 isolators for geysers Install 4x4 surface mount wonda box at flush box and separate cable entries x2 Close connection at corner of roof space Upstairs roof space Install 2x4 surface wondabox in place of flush box and cover. Replace 4x4 flush box with surface mount box and separate cable entries. Bar area. Area tripping faulty transformers. Replace all with v led warm white lights X10. Outside front Install isolator for gate motor Main DB Downgrade 40amp above to 30amp Install blanks to open spaces Label joinery
We have already dug open the underground sewerage pipe. Roots of a tree grew into old clay type sewerage pipe. We shall also remove the existing sewerage pipe , 5 meter length. We have already bought the new mm underground sewerage pipe ( 6 meter length) as well as the connecter fittings ( mm ) . We have also bought the river sand which should be placed in the trench underneath the new pipe and also on top of the new pipe. Please quote to place the new pipe.