Ac don't have remotes
I wish to protect my valuable assets in the house
My main water pipe is leaking I need a New pipe
Building three homes on a stand in Mosselbay. A. Container 1x 12m2: 1. 1 x bedroom on left with en-suite: bath and toilet 2. 1 x bedroom on right with ensuite: shower and toilet 3. Entrance open plan kitchen/lounge B. Container 2 (the 12m2) to be the same as container 1 except both rooms to have a shower instead of bath. C. Container 3 (the 6m2) 1 bedroom with small shower in en-suite Services: Water, electricity, sewage connections, prepare stand that is currently on a slope Finishings: -black aluminum windows -sliding door for front -stable type back door -All finishings to be in white -Two x 12m containers to be placed in L- shape and 6m2 container to be place on side of container 1 to form a U shape
In mm double windows (opening upper part) h w Kitchen double windows (opening upper part) h w (dining major double window double opening h w (living left) major double window double opening h w (living right) Single windows h and w (side kitchen) Single window h w w (stoep)
I need an electrician to just reconnect my oven and stove top currently they are connected to the same circuit breaker in the DB board I just need an additional circuit breaker installed (part needed) for the stove top and for it to be connected. The wires are already there and in place. Please provide a quote for work and circuit breaker.
My house was partly gutted and thus need it to fixed where the facer boards had burnt and the connecting tiles replaced as well as where the house was built on there seems to be a leak of sorts and air coming through. As every morning my room is damp. With dust coming through and damp settling on the ceiling causing mould
I am a registered electrical engineer in South Africa and installed my own solar panels, inverter and battery. I need an electrical compliance certificate for the solar installation and also my whole house for claiming for tax purposes. The house has 2 DB boards, one for main house and other for cottage.
I have 4 smart tuya circuit breakers/timers that I need installed. The first will be used to monitor power usage of the entire house, the second will replace a geyser timer. The third to replace a pool timer and the 4th is to be used as a timer for the pool light. They are all tuya smart breakers and are supplied. The pool light is currently V i would also like it to be switched to 12V (I do not have a transformer).
A small block of flats needs help maintaining the 10 single-car wooden garage doors, including 1 that was recently installed & painted, and 1 that was recently installed but not yet painted. Here is the work that needs to be done: A) 8 older garages - Exteriors need to be sanded, primed (2 layers), and painted white (2 layers). Interiors need to be oiled (silkwood/linseed). B) 1 brand new, unpainted garage - Exterior needs to be primed (2 layers), and painted white (2 layers). Interior doesn't need oiling (was just done). C) 1 recently painted garage - Exterior needs 1 layer paint (to match other whites), but no sanding/priming needed. Interior needs to be oiled (silkwood oil provided by owner). See photos of some of the garages for reference. We'd like a quote for labor, paint, and oil.