49 panels of precast wall need their poles replaced. Must be sturdy 3m poles and must be mm minimum underground. The wall is currently not stable.
An home for Gbv people
Three bedroom flat with end suite, shower and toilets, kitchen and dinning room, balcony
Will be off the grid. Basic 20sqm bedrooms x 3 plus 2 x bathrooms of 10sqm each and 20sqm open space for kitchen and living room
Plans were submitted and approved. An engineer has been appointed. Want to remodel (break down 2 walls and refurbish existing bathroom) sub economic house and add an upper level consisting of a bathroom, 2 bedrooms and a pyjama lounge. The plan is to use nutec/timber on the upper level and a conservatory on the ground floor level. Please see attached plan.
Medical facility with dry walking to be done. Also electrical points etc with reception area and nurses station. I need companies on site tomorrow in Randfontein for quotations. Contact Number: +27 67
I need to destruct current garage and build double garage with separate room and toilet
3 bed home partial double storey & double garage
House extension