How long does an architectural project typically last?
Let's go over the timeline for the construction of a new family home.
I want to change the Cupboard in my kitchen and install granite counter tops
Flat on top of existing building
Building pool Doing paving Boundary wall Other
Drain from the bathrooms/toilets to the main municipal drain is blocked. Drain unblocking needed.
The toilet upstairs needs to be replaced as its dripping and leaking and our front door downstairs is now getting wet and the door is not closing properly.
The toilet drain sewage has been blocked
Water pipe needs to be replaced.