Claim it for free and start getting requests from customers in your area.
Claim profile for freeWe are selling our house and moving to George in April this year. It is an old Cape Dutch farm house and we need a full rewiring of our current electrics which has been done by the previous 2 owners without a legal COC. As far as we are aware, it is not registered as a heritage house. It is an old wiring system with some new cables that still needs to be put in to conduit. We have a solar system (which needs removing or updating), a heat pump, an alarm system and electrics running underground to our workshop (1 light switch), small cabin in garden (4 light switches) and a pool with pool pump. It is a teard level landscaping with rock borders, ponds, a bridge, concrete stairs and cement everywhere so not an easy pathway for the electrics to the outside buildings and pool.
I am looking at a Residential, full bill-reduction, single-phase system. Current monthly electricity bill is about R to R per month on prepaid metre. Roof is Flat IBR. Have a pool pump. Interested in installing a heat pump for the geyser. Can I get credits for excess power feedback into the grid to use at night?
We have a 4 bedroom house with 3 adults. Additionally we have a 1 bedroom wendy house occupied with 2 adults and another self standing 1 bedroom flat with 1 adult. We have 1 electrical geyser. Other 2 geysers are gas. All electrical appliances as normal, fridges x 3, tvs, hairdryers, combination gas and electrical stove x 2, but one gets hardly ever used. 2 x washing machines and 1 tumble dryer. 2 x kettles.
A professional electrician who is from Zimbabwe went through the trap door into my ceiling last September and advised that my electrical wires in the ceiling must be in bigger plastic hard pipes meant for.thst purpose and volunteered to do that for me this year at only R INCLUSIVE OF LABOUR IF I BUY THE THINGS THAT ARE REQUIRED FROM THE HARDWARE WHICH CODT LESS THAN R
Big Farmhouse and shed I will install solar geysers. 40 to 50x 60w lights rooms kitchen etc 5 x LED florescent tubes in shed meat saw, 32 mincer and battery charger 4x deep freezers 3 x fridges 4 security lights 3m x 3m 2,5m coolroom two kitchens with gas electric stoves swimming pool pump 1.5 kw borehole pump that is used for 3 to 4 hours per day 3 x ceiling fans workshop with drill and welders and other power tools At present we are using 3phase eskom power but not sure if single phase may be better or more cost effective if we go the solar rout Large roof space facing NNW
I have had a 15 kva system installed 2,5 years ago 18 JA half cut panels , 3 x5 kva Deye inverters and 3 x 5.2 Deyness batteries , since i had a control panel failure on main inverter repaired under warranty , now a loose connection on one stream dc breaker tightened all connectors , my problem is i dont trust the installation thats done would like a inspection and quote .
Good Day I recently moved into a new property after purchasing it and to my surprise my geyser is not working and I got someone to check it and he found out that the element is not working , motor gate and the lights outside are not working. When plugs and stove are on at the same time it traps , attached is copy of the COC and I have been asking for the original from the owner and she keeps on saying she will bring it Please can you advise what needs to be done in this case .I have attached the copy of the COC which is a bit faded .
I will need 2 panels of roughly W. They will connect straight into a Ecoflow Delta 2 Max. The limitation of the Ecoflow's input is 60V and 15 Amps maximum. It connects to the solar panels via two MC4 to XT60 cables (3.5m should be enough). It has two solar inputs so each panel connects to a port.
1. Replace current motion sensor flood light with day night sensor and new 30W flood light. Install 2nd new 30W flood light about 20 meters away from existing floodlight. See picture showed with red and green arrow. Both flood lights to operate on same existing switch and day night sensor. All materials will be supplied apart from cable. 2. Wire wall socket plug. Cover for wall socket available 3. Install 2 new wall mounted lights under awning. Existing cable in place. Light fittings will be supplied.
I have a two Deye inverters and Pylontec batteries. One invert seems to be still working but the WIFI Logger might be faulty as I'm struggling to get the inverter back onto the Solarman monitoring application. Ultimately I'd like to ensure that the system is properly configured so that I can monitor the system (with both inverters). Some of the batteries seem faulty as the LED lights are partially on. Can you assist audit the system and how we can repair and optimize the system?