2 toilets are running. I have to turn the water off to stop it running. 1 toilet is dripping at the pipe heading into the loo. The top element in the oven isn't working. Is this something you can look at? One recliner's mechanism is broken. Pull the lever and nothing happens Please send me a WhatsApp message before calling as I don't often answer foreign numbers.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Front part of new house needs roof installed. I have some trusses left that was also used in back part of house that is already installed. Approximately m2 left to be done right away. I have all the tiles already. House is in Mooivallei Park Potch. I need a roofing carpenter to ensure the job is done right. Additional m2 roof will be needed on second level but not urgent right now.
we have been renovating some of the house over the last couple of years, but we are looking to upgrade so that we can sell the house for more. upgrading includes a full renovation of the kitchen and scullery area, upgrading two bathrooms, replacing all the window frames and flooring, skirtings, fireplace, painting and stiling the 5 bedroom house.
Hi, I urgently need a quote please for some repairs on a property rental in North End. It's my moms property and she's battling with the tenant. Please let me know urgently if you can assist with a quote on repairs. Kitchen cupboards, counter top replacement, toilet seat replace, fix bedroom cupboard door, soap dish in bathroom ect.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
The front door to my property is rotting and I need to replace it. The property is part of a sectional title so it need to be compliant with all the other doors in the complex. I have attached a picture of one of the other aluminium doors in the complex. It would be to fit and install a standard size front door. Measurements can be provided or you are more than welcome to go and measure the door. Looking forward to hearing from you. Regards,
Good day Sir / Madam I trust this email finds you well. We are kindly requesting you guys come and do a site inspection at 90 Bekker Road, Vorna Valley Building A, Hertford Office Park, Midrand ( Do advise when you can come through) on the following request, • 5 Red plugs with 5 external multiplugs • The plugs must be round on the LIVE POINT ( not a half hole please ) • The plugs will be mounted on the poles and external multiplugs can be connected externally there ( picture attached ) The quote must include the following: • Labour rates ( For after-hours) • Show us a consumable explanation of the reg plugs in terms of power usage • installation costs (Including Cabling on walls and desk to the Genset)
We are in the process of purchasing a home and from the engineers inspection, it looks like we may need a roof replacement/repair as the clay tiles are old. The structure is still in tact. I'd like to get a quote to understand potential future costs in the next couple of years. I would prefer contact via email or whatsapp. Thanks!
Good morning Please would you quote me for building the carport attached. I've attached the following: 1. Picture of my house where the carport will be 2. My neighbour's carport (my carport should also be similar) 3. Drawings by architect (6m x 6m are the dimensions), they have been approved by municipality finally 4. The picture of an example where the 4th pillar needs to be slightly in (this will also be necessary in my carport, for easy exit out of the garage).