Looking for a certified electrical contractor for a new construction project. From initial City Power application to final sign off. (Labour only) Project is 18 Units. 9ground floor units and 9 first floor units in one block. 2 bedrooms/Unit. Units about 42 sqm Rough estimate per unit is as follows * 10 plug points * 7 light sockets * 5 light switches * 1 DB board * 1 Stove switch Perimeter lighting points and access gate electrification
I am in a process of building a house so I want to know the prices for each and everything that will be needed as I am building this house from my own pocket. I need to know how much will it cost to install and supply the driveway gate. I would really appreciate it if you attach pictures of the gates together with the quote.
want to know how much a new db will cost me with 2 x20amp circuit breaker and 1x10 amp circuit breakers ,40 A man circuitbreaker and one earth leakage ,to new led lights in bathroom amd bedroom . and one lightswitch for bathroom with its extetion box as it is old steel ones ,,how mich will it cost to supply and rewire db again .its only this beacuse its a outside builder at the back of my house
Garage installation 1. Small DB(E/L plus two c/b 20A and 10A) 2. 20mm pvc conduit (3) 3. 20mm 90 degree bends (5) 4. 20mm hospital saddles (10) 5. 20mm male adaptors (6) 6. 20mm couplers (3) 7. 20mm 3way junction box (3) 8. 1.5 led double fitting (1) 9. 4X4 surface mount box (2) 10. 4X4 single plug (2) 11. 4X2 surface mount box (2) 12. 4X2 two-way switch (1) 13. 4X2 double switch, one-way and two-way (1) 14. 20watt led flood light (2) Please quote me on the above-mentioned items supply plus installation Please call me for more info.
My geyser switch keeps tripping on the DB board. We live in a complex so I contacted the body corporate that sent an electrician and said the thermostat was faulty. The electrician replaced the thermostat but the problem still persists. Not sure what else the issue could be. Please advise how much it would cost to repair?
I have a wooden automatic garage door and the tenant informs me that he experienced problems with the door. I, therefore, want a specialist in automatic wooden garage doors to inspect the motor and mechanism of the door and give me a written report of their findings and their professional recommendations on how to solve the problem. I suspect the maintenance is not up to date. Regards
I have a 2 Bedroom Townhouse in Gonubie it has18 plug points. There is a -litre Geyser, 4 plate stove/oven. Would like to have this done in stages, plug points first, then Geyser, lastly Stove. I need a professional that knows how to install a solar panel that will accommodate all of the above-mentioned points. Please feel to contact me for more info.
I need a quote for the supply plus the installation of the following door sizes: 1. 2.*2.m 2. 0.*2.m 3. 0.*2.m 4. 0.*2. I need a breakdown of each and every door listed above i.e. ( size, labour for the installation and then material). Please feel free to contact me for more info.
I would like the fence to be meters on two sides and meters on two sides. I would also like to have 4 meters rolling gate at one corner. The fence should be 18 lines of which 9 are electric and 9 are barbed wire at a length of 1.8 metres. I do not have network coverage so please send me a Whatsapp text we will take it from there. Thank you
Senior Phase LED Lights: 39 maintenance; 8 new installations 6 Bulbs removal and replacement 13 Disco-light bulbs replacement 1 Floodlight installation 2 Garden pole lamps replacement Foundation Phase LED Lights: 13 replacement; 2 new installation 3 Floodlights installation 1 New plug point 2 repositioning of existing lights I also need a COC