Want to get of the grid in total even if needs to be completed in phases.
Private property in Norwood, about M2.
Double Storey, 4 bedroom house. I would like a system that runs of the panels during the day and have enough back up power for load shedding if at night. I would like the system to run everything except the geyser.
I want to wire 8 room house
Redoing a small narrow unsuite bathroom
Two bedroom, open plan kitchen & lounge, main bedroom needs to have an en-suite with a shower and a bath tub.
Retaining wall to be built along length of the house and as a support structure for sinking swimming pool . Foundation to be pinned. Large tree to be removed with root system to be killed off. Septic tank and sewage system to be replaced. Water and geyser system to be replaced/upgraded to improve water pressure and flow. Floor tiles to be removed so that foundation can be repaired. Tiles to be replaced. Major structural cracks on walls to be repaired.
Good day I need an elastration to do a load testing for me. I want to install an inverter, but need to know what how much wattage is required, based on my needs. Regards
I am looking for a w panel at the moment.