Room 1 new double point plug point with box and calvinized pype 2 existing plug point with new box and double point plug 2 blank box and cover for unused underfloor heating point 2 existing light box and dimmable toggle switch 1 new light switch with box and dimmable toggle switch 3 light fittings installed Living area 10 new double point plug point with box and calvinized pipe 6 existing plug point with new box and double point plug 1 oven point with new box and isolator 2 new light switch with box and dimmable toggle switch 8 new light switch circuits 6 dimmable globes cool white for spots lights 6 new light switch with box and dimmable toggle switch in calvinised pipe and fittings installed 2 move and adjust light fittings Stairs 2 existing light box and dimmable toggle switch 1 light fittings installed Sub DB 1 split of circuits fo non essential and essential
4 x garage
Main circuit breaker has tripped. Unable to restore power since last night. I have unplugged eveything
New construction of a house at Leloko Estate in Hartebeespoort , as per architectural plans. Builder to be NHBRC registered
i would need a compliance certificate for insurance purposes
Extension of main bedroom and addition of end suite
Re-partition, plumbing, painting.
Installation of Smart Wifi Geyser timer switch Installation of bridge to connect lights to Earth leakage
New geyser installed in outside wall