The toilet cistern does not stop filling when it reaches its fill and water keeps draining into the toilet which wastes water. I, therefore, need to open and close the water valve which feeds into the cistern to fill and stop filling it which is very annoying. The cistern lid is also broken so I suspect that a new toilet cistern would need to be installed. I need help, please feel free to contact me
I would like to get a quote for a plumber to come out to my house to do the following: 1. Check all taps some are leaking and some do not work at all 2. Repair or replace 2 x toilet cisterns (leaking) 3. Install and plumb new shower (Have fibre glass floor, waste, taps, shower head and doors.) 4. Supply and install hot water system to new shower. 5. Repair toilet waste pipe Our main concern are the leaks as the water account has gone up drastically. Please email only. Thanks.
I am requiring 4 outside doors, internal we already have. Quote for aluminum doors and windows, and wooden doors and windows. I will give the sizes when I receive the list of suppliers. I would like a quote on 2.1 sliding patio door by 2.1 in bronze. I would like the suppliers to make contact with me.
Require a quote for a repair for a water meter with a leak on the incoming pipe from the main in the street, to entering the meter. The meter is old apparently and the brass or copper pipe seems to be rusty and is clearly leaking at the joint. It possibly has more leaks. I need a detailed coating of the repair in terms of materials needed and hours to repair. My voice is recovering at the moment, so I won’t be audible on the phone. Please whatsapp/email me.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
Front part of new house needs roof installed. I have some trusses left that was also used in back part of house that is already installed. Approximately m2 left to be done right away. I have all the tiles already. House is in Mooivallei Park Potch. I need a roofing carpenter to ensure the job is done right. Additional m2 roof will be needed on second level but not urgent right now.
Waterproofing to the balcony: Aluminum doors will be removed to the balcony. Aluminum doors and frames will be wrapped in bubble wrap and stored in the garage for safekeeping until re-installation. All cement and waterproofing layers will be chopped up and removed off-site from the balcony. Rubble skip will be on-site and removed once it is filled. All existing waterproofing will be removed. mm Turn-ups will be chopped off in order to apply the waterproofing application onto the bricks. Existing outlets will be removed. New 63mm Flange outlets will be fitted to the parapet walls to allow water to discharge outside of the balcony. Screed-to-fall will be done to ensure water runs out of the outlets, and that there will be no water ponding in any areas. 50x75mm Angle will be fitted where the door will be fitted to prevent water from running back into the rooms. The waterproofing application will consist of the following: x2 Coats of Mapei-Lastic Mapei-tape to all turn-ups and corners and into the cavities. Mapei-net the flat surface x1 coat will be applied, followed by the Mapei-net and Mapei-tape being applied on top of the 1st coat. 2nd coat will be applied over all of the above-mentioned after 24 hours. Aluminum doors and frames will be re-fitted. Turn-ups and bands around the frames will be plastered to a smooth finish. Waterproofing application and plaster will be left for x3 days before the painting and tiling can commence. New tiles will be installed.
The front door to my property is rotting and I need to replace it. The property is part of a sectional title so it need to be compliant with all the other doors in the complex. I have attached a picture of one of the other aluminium doors in the complex. It would be to fit and install a standard size front door. Measurements can be provided or you are more than welcome to go and measure the door. Looking forward to hearing from you. Regards,
We are in the process of purchasing a home and from the engineers inspection, it looks like we may need a roof replacement/repair as the clay tiles are old. The structure is still in tact. I'd like to get a quote to understand potential future costs in the next couple of years. I would prefer contact via email or whatsapp. Thanks!
Please I would like to have a quotation of a building that has a floor and ceiling that is damaged because of an air handling unit that is placed on top of timber floor. The ceiling below that floor is also affected. Please I would like to have the following in the quotation: 1. An investigation on the cause and extend of the water damage on the floor/ceiling. 2. On top of the timber floor there is a torch-on waterproof. What is the rate of the waterproof when it is removed and when it is replaced with new. Thank you. Kind regards,