The dwelling consists partly of the original timber framed & clad unit possibly constructed years ago plus 's extensions providing two enlarged bathroom, two additional bedrooms and kitchen. The existing legacy installation requires to be tested for safety/compliance. Earth resistance of a socket outlet circuit in the original timber frame & clad building is unacceptably high. Installation consists largely of conductors in steel conduit which is employed as the earth return. Some wiring consists of twin & earth cable possibly installed during the 's. The dwelling consists of lounge/dining room, three bedrooms, kitchen, bathroom, shower room & garage where a more recent DB has been installed. The property is rented to tenants.
I need a municipal electrical cable joined/ fixed. CoCT has determined there is a problem and provided me with a temorary emergency cable. The problem is under the tarred driveway according to them. See X on photo. Company must also be able to fill and retar after the work is completed or refer me to someone who can.
Remove existing light fittings and old cables. Supply and installation of 1.5mm black round cable for light fittings. Supply and Install 2.5mm cable for the plugs including double compartment power skirting (plugs). Supply and installation of 3 pir wall motion sensors. Supply and installation 10 LED x light fittings. Label DB accordingly.
I am almost % sure but needs be checked...I I am pretty sure Iam paying electricity for at least another 2 units here. Its an old original farmhouse divided into 7 units ...Mine is upstairs where probably, the main distribution board is. I have had zero (literally zero) elec. used since midnight and yet my prepaid for past week has been reflecting vast usage...I keep a record of almost every day re what appliances used, how long the geyser is on for etc this makes NO sense. Single occupant on and soared up to R to R p.m. ridiculous no stove, no longer even a table top stove...no heating geyser was off...Kettle filled once or twice a day and boiling water put in thermo flask
I need a quote to install a surge arrester. It must be as per the SANS/IEC -11 low voltage surge protection standards, installed on the main electrical distribution board and the device must: – Be a type 2 device. – Be designed to withstand at least peak surge currents of 40kA (/max). – Be wired in terms of SANS -1 Connection type 2. – Have a status indicator to indicate if the protector is operational or not. – Be installed by a registered electrician who must provide a Certificate of Compliance for the installation.
Im bidding for a contract to install , solar panels on an existing ground mounted structure. The scope of work is 1. Install the two rows of aluminum railing on and existing ground mounted frame 2. Mount the panels on the railing. All electrical connections will be done by an electrical contractor
Walk in Fridge on farm. 2.5 by 2.5 by 2.2 (H). Need 12 BTU aircon to cool the room with heating coil to prevent freezing of the blower. Need temprature between 3 and 7 if possible. Will collect. Stay in Thabazimbi/Marakele. Unless you want to stay over in this beautiful mountains over a weekend. You are welcome. Can drive you for one day through the Park.
Hi please provide a high level quote for a complete solar system for a 3 bedroom house with 1 x geyser and standard set of appliances. When ready to proceed an onsite inspection and final quotation can be provided. I fully understand that there may be a variance with the price after the onsite inspection. The quote is to work out the budget required.
Midea Under Ceiling Btu/hr (3 Phase) Non-Inverter Air Conditioner Model MUE-60HRN1-R Eco-friendly RA Gas. Attractive design for under ceiling installation or vertically against a wall. 4 models from Btu/h to 60 Btu/hr. Cooling and Heating. Wide angle air flow creates more comfortable air circulation Multi-blade fan and double air guides creates a smoother airflow and less turbulence Piping between outdoor and outdoor can be up to a max. of 50m. For areas up to m². Noise Level: 55dB(A) This unit uses Three Phase power. Enquire about Installation as this is not a standard product. Refer to the brochure for further specification including dimensions. Pictures of outdoor units may differ from actual depending on the model. 12 Month Warranty. Free Delivery Nationwide – South Africa. Excellent value for money!
Point to Multipoint solution between Vodaworld in Midrand (Base station), Blue Hills Shopping Centre, New Chapter Bookstore and Scoop Distribution (all in Midrand). Constraints: 1. The termination speed of the fibre is 2 Gb/s at Vodaworld. 2. A tower of 12m high is available at Vodaworld, a tower of 6m high is available at Blue Hills Shopping Centre, a 4m tower at New Chapter Bookstore and a 10m tower at Scoop. 3. A minimum wireless data speed of 1 Gb/s is required, with a latency less than 15 milliseconds. 4. You can have 50m of free electric cabling at both ends.